From Treasury Metals Inc. to the Canadian Environmental Assessment Agency re: Response to First Round of Information Requests Related to the Environmental Impact Statement (see reference document # 23)

Cover Letter (PDF – 557 KB)

Revised Envrionmental Impact Statement

Executive Summary (PDF – 29.2 MB)

Table of Contents (PDF – 703 KB)
1.0 Introduction and Project Overview (PDF – 8.51 MB)
2.0 Assessment of Alternatives (PDF – 10.5 MB)
3.0 Project Description (PDF – 18.3 MB)
4.0 Accidents and Malfunctions (PDF – 207 KB)
5.0 Existing Environment (PDF – 41 MB)
6.0 Description of Project Effects (PDF – 125 MB)
7.0 Cumulative Effects (PDF – 3.94 MB)
8.0 Determination of Significance of Residual Effects (PDF – 1.43 MB)
9.0 Aboriginal and Public Engagement (PDF – 148 KB)
10.0 Summary of Commitments (PDF – 34.6 KB)
11.0 Benefits to Canadians (PDF – 26.7 KB)
12.0 Environmental Management Plans (PDF – 176 KB)
13.0 Environmental Monitoring Program (PDF – 248 KB)
14.0 Conclusions (PDF – 255 KB)
15.0 References (PDF – 50.8 KB)

Appendices

Appendix A – Table of Concordance (PDF – 296 KB)
Appendix B – Optimization Study (PDF – 854 KB)
Appendix C – Mining Study (PDF – 1.09 MB)
Appendix D – Tailings Storage Facility (PDF – 31.3 MB)
Appendix E – Traffic Study (PDF – 7.07 MB)
Appendix F – Water Management Plan (PDF – 189 KB)
Appendix G – Environmental Baseline (PDF – 59.9 KB)
Appendix H – Acoustic Environment Study (PDF – 9.59 MB)
Appendix I – Light Environment Study (PDF – 2.59 MB)
Appendix J – Air Quality Study (PDF – 8.85 MB)
Appendix K – Geochemistry (PDF – 1.17 MB)
Appendix L – Geochemical Modelling (PDF – 58.8 KB)
Appendix M – Hydrogeology (PDF – 8.49 MB)
Appendix N – Surface Hydrology (PDF – 1.85 MB)
Appendix O – Hydrologic Modeling (PDF – 45.8 KB)
Appendix P – Aquatics DST (PDF – 6.99 MB)
Appendix Q – Fisheries and Habitat (PDF – 21.4 MB)
Appendix R – Terrestrial (PDF – 8.17 MB)
Appendix S – Wetlands (PDF – 66.8 MB)
Appendix T – Socio-Economic (PDF – 4.76 MB)
Appendix U – Heritage Resources (PDF – 7.01 MB)
Appendix V – Public Engagement (PDF – 671 KB)
Appendix W – Screening Level Risk Assessment (PDF – 3.81 MB)
Appendix X – Alternatives Assessment Matrix (PDF – 878 KB)
Appendix Y – EIS Guidelines (PDF – 725 KB)
Appendix Z – TML Corporate Policies (PDF – 427 KB)
Appendix AA – List of Mineral Claims (PDF – 116 KB)
Appendix BB – Preliminary Economic Assessment (PDF – 11.6 MB)
Appendix CC – Mining, Dynamic And Dependable For Ontario's Future (PDF – 2.28 MB)
Appendix DD – Aboriginal Engagement Report (PDF – 3.82 MB)
Appendix EE – Country Foods Assessment (PDF – 7.33 MB)
Appendix FF – Photo Record Of The Goliath Gold Project (PDF – 1.78 MB)
Appendix GG – TSF Failure Modelling (PDF – 2.12 MB)
Appendix HH – Failure Modes And Effects Analysis (PDF – 214 KB)
Appendix II – Draft Fisheries Compensation Strategy and Plans (PDF – 2.07 MB)
Appendix JJ – Water Report (PDF – 16.3 MB)

Round 1 Information Requests

Annex A1 Responses (PDF – 2.64 MB)

Annex A2 Responses (PDF – 342 KB)

Annex A3 Responses (PDF – 2.64 MB)

Annex A4 Responses (PDF – 465 KB)

Document reference number: 25

Date modified: