Environment and Climate Change Canada climate station relocation, Gros Morne National Park
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
An ECCC weather station has been in operation in Gros Morne for decades, but does not meet current standards for climate monitoring due to topographic setting and proximity to a parking lot, so will be decommissioned. A more suitable alternate location has been identified in a decommissioned section of Berry Hill Campground, and a fully functional climate station will be installed there. This will provide improved weather information for park operations, visitors, and communities, as well as better climate data for park and national climate monitoring programs. The proposed site is out of sight of the operational portion of the campground, and most construction will occur in fall after the campground is closed. Construction will begin in September 2020 and will be completed in 2021. A 1 hectare site will be cleared and levelled, and a 30m x 30 m area in the center will be seeded and fenced and climate monitoring instruments will be installed. The site already has road access, and the station will operate using solar power and wireless communications, so no new access or utilities are required. The proposed site falls within a Zone IV area; these areas have vehicle access and include front country facilities and roads (including parking lots, campgrounds, and day use areas). The climate station is consistent with the area's zoning.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New Project Being Assessed by Parks Canada - Public Comments Invited 15 June to 15 July. 2020 | - | June 15, 2020 |
Contacts
Gros Morne National ParkPO Box 130
Rocky Harbour, Newfoundland and Labrador A0K 4N0
Telephone: 709-458-2417
Email: pc.grosmorne.pc@canada.ca
-
Location
- Gros Morne National Park (Newfoundland and Labrador)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2020-06-15 -
Proponent
Environment and Climate Change Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80780
Nearby assessments
...within 200 kilometres-
Martin Point Landfill Remediation
Gros Morne National Park of Canada -
Shoreline Protection, Rocky Harbour, NL
The DFO-SCH project site is located in Rocky Harbour, Newfoundland. -
Transmission Main from Chlorine Building to West Link Road
Rocky Harbour -
Green Point Access Road Widening
Gros Morne National Park of Canada -
Harbour Development, Norris Point, Newfoundland
Norris Point (Neddys Harbour) -
Highway 431 and Tablelands Trail Access Road and Parking Lot Renovations
Gros Morne National Park of Canada -
Trout River Gulch Public and Commercial Snowmobile Corridor
Gros Morne National Park -
Wharf Reconstruction, Trout River, Newfoundland
Trout River -
Western Brook Bridge Replacement
Gros Morne National Park -
Summer guided activities by business license holders for Gros Morne National Park
Gros Morne National Park -
Lomond River fishway replacement
Lomond River -
Visitor Centre Recapitalization in Gros Morne National Park
Gros Morne National Park -
Wharf Replacement, Frenchmans Cove, Newfoundland
Frenchmans Cove -
Harbour Development, Lark Harbour, NL
Lark Harbour, Newfoundland -
Lark Harbour Search and Rescue Wharf Extension
Main Road, Lark Harbour -
Wharf Reconstruction, Westport, NL
Westport, Newfoundland -
Harbour Entrance Improvements, Fox Island River, NL
The DFO-SCH project site is located in Fox Island River, Newfoundland. -
Marginal Wharf Reconstruction, Port aux Choix, NL
Port aux Choix, Newfoundland -
Launchway Improvements, Port Au Choix, NL
Port aux Choix, Newfoundland -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Ammonia and hydrogen production facility -
Fishway Reconstruction, Indian River, Springdale, NL
Indian River, Springdale, Newfoundland -
Point Rousse Port Facility Project
Baie Verte -
Slipway Construction, Lourdes, Newfoundland
Lourdes -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Port au Port wind farm -
Breakwater Construction, Barr'd Harbour, NL
Barr'd Harbour, Newfoundland -
Harrington Harbor hauling slip repair
Harrington Harbour -
Floating Dock Installation, Nippers Harbour, NL
The DFO-SCH project site is located in Nippers Harbour, Newfoundland. -
Valentine Gold Project
Valentine Lake -
Completion work by the BCNHST, to bring the new transfer facilities for hydrocarbons up to standard - Tête-à-la-Baleine Wharf
Tête-à-la-Baleine Wharf -
DFO-SCH Floating Dock Installation, Roberts Arm, NL
Roberts Arm -
Wharf Reconstruction, Cape St. George, Newfoundland
Cape St. George -
Marginal Wharf Construction, Lushes Bight, NL
The DFO-SCH project site is located in Lushes Bight, Newfoundland. -
Harbour Cleanup, St. David's (Crabbes River), NL
St. David's (Crabbes River), NL -
Floating Dock Installation, La Scie, NL
The DFO-SCH project site is located in La Scie, Newfoundland. -
Saint-Augustin Wharf - Relocalisation of marine lines
Saint-Augustin Wharf -
Demolition of the Rappel Tower at Canadian Forces Base Beaumont Hamel Armoury, Grand Falls - Windsor, Newfoundland and Labrador
Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Codroy area wind farm -
Wharf Reconstruction, Phillip's Head, NL
Phillip's Head, Newfoundland -
St. Barbe Ranges Replacement
St. Barbe