Labrador-Island Transmission Link Project
Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project.
This environmental assessment was started as a screening on November 24, 2009. On, April 14, 2010 as a result of the January 21, 2010 Supreme Court of Canada ruling in MiningWatch Canada v. Canada (Minister of Fisheries and Oceans et al.), it was determined that the environmental assessment in relation to this project will be continued as a comprehensive study.
The Labrador - Island Transmission Link Development Proposal, as presented by the proponent, Nalcor Energy, involves the construction and operation of an approximately 1,100 km long transmission line and associated infrastructure within and between Labrador and the Island of Newfoundland.
The scope of the project includes the High Voltage Direct Current (HVDC) overhead transmission line commencing at a converter station at Muskrat Falls in central Labrador, proceeding southeast across Labrador, crossing the Strait of Belle Isle via submarine cables, and proceeding across Newfoundland to end at a converter station at Soldiers Pond on the Island's Avalon Peninsula. The project will include the installation of shoreline electrodes (with associated transmission lines) at two locations, in the Strait of Belle Isle at L’Anse au Diable and in Conception Bay at Dowden's Point.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
List all records
Contacts
Fisheries and Oceans CanadaRoger Johnson
NAFC Northwest Atlantic Fisheries Centre
80 East White Hills Road
PO Box 5667
St John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-3296
Email: Roger.Johnson@dfo-mpo.gc.ca
-
Location
- Forteau (Newfoundland and Labrador)
- Mistaken Cove (Newfoundland and Labrador)
-
Project Type
- Hydroelectric Energy
-
Status
Completed -
Start Date
2010-04-14 -
Proponent
Nalcor Energy -
Authorities
- Canadian Environmental Assessment Agency
- Fisheries and Oceans Canada
- Natural Resources Canada
- Public Works and Government Services Canada
- Transport Canada
-
Assessment Type
Comprehensive study under CEAA 1992 -
Reference Number
51746
Nearby projects
..within 200 kilometres-
Removal of Above Ground Storage Tanks at Lourdes-de-Blanc-Sablon Airport
Lourdes-de-Blanc-Sablon Airport -
DFO-SCH Harbour Development, Lodge Bay, NL
Lodge Bay, Newfoundland Labrador -
Foxtrot Rare Earth Element Mine Project
10 kilometres west of St. Lewis -
Building Upgrades - St. Lewis, NL
St. Lewis -
DFO-SCH Infilling and Floating Dock Installation, Pinsent's Arm, NL
DFO-SCH Infilling and Floating Dock Installation, Pinsent's Arm, NL -
Point Rousse Port Facility Project
Baie Verte -
Completion work by the BCNHST, to bring the new transfer facilities for hydrocarbons up to standard - Tête-à-la-Baleine Wharf
Tête-à-la-Baleine Wharf -
Western Brook Bridge Replacement
Gros Morne National Park -
Summer guided activities by business license holders for Gros Morne National Park
Gros Morne National Park