Century Gold Project

Porcupine Gold Mines, a subsidiary of Goldcorp Canada Ltd., is proposing the construction, operation, decommissioning and abandonment of a new metal mill as well as the expansion of its existing Dome Mine, located in Timmins, Ontario. The area of mine operations for the existing Dome Mine would increase by over 50%. As proposed, the Century Gold Project would operate for 10 to 16 years, and include an open-pit gold mine with an ore production capacity of 70,000 tonnes per day. The on-site metal mill would have an ore input capacity of 70,000 tonnes per day.


Latest update

July 20, 2020 — The Impact Assessment Agency of Canada terminated the environmental assessment of the designated project at the request of the proponent.

Participate

Key documents

Key documents
Document Number Document Title File Date
12 Notice of Termination - July 20, 2020
10 Final Environmental Impact Statement Guidelines PDF (564 KB) November 16, 2018
6 Notice of Commencement of an Environmental Assessment - September 27, 2018
2 Summary of a Project Description of a Designated Project PDF (15.9 MB) July 30, 2018

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca


  • Location

    • Timmins (Ontario)
  • Nature of Activity

    • Mines and Minerals
  • Assessment Status

    Terminated
  • Proponent

    Porcupine Gold Mines, a subsidiary of Goldcorp Canada Ltd.
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Environmental assessment under CEAA 2012
  • Reference Number

    80155
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Date modified: