Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Wahnapitae First Nation is expanding the amount of homes within their community to ensure adequate housing is available to community members. To accomplish this, the community will construct five (5) new homes, and bring in utilities for seven (7) lots to ensure an adequate stock of homes remains available. All homes will be less than or equal to 1250 square feet, and will require drilled wells and septic fields. The homes will be heated via propane heating, and hydro service is readily available at the lot line.
The lots are currently vacant and ground material will be removed where necessary. A stand of mature pine trees will not be removed as part of this home construction, and will be preserved for residence enjoyment.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing | - | December 19, 2019 |
1 | Public Comment Period on Intent to Make a Determination | - | November 12, 2019 |
Contacts
Indigenous Service CanadaPhilip Stringer, Environment Officer
760 Notre Dame Ave
Unit M
Sudbury, Ontario P3A 2T4
Telephone: 705-522-3475
Fax: 705-677-7976
Email: philip.stringer@canada.ca
-
Location
- Wahnapitae First Nation (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2019-11-12 -
Proponent
Wahnapitae First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80305
Nearby assessments
...within 200 kilometres-
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Wahnapitae First Nation
Wahnapitae First Nation -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Victoria Mine Project
Southwest of Sudbury -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
VLA Water Plant Replacement
Nipissing -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
MMnogin Constructed Wetland to Support Sustainable Water Treatment -
Portage Dam Concrete Storage Pad
Portage Dam -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
Latchford Dam - Public Safety Fencing
Latchford Dam -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
New Stoplog Lifter Latchford Dam
Latchford Dam -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Energy East Project
North Bay -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Haileybury Bin Wall Repairs - Summer 2021
Haileybury -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
Côté Gold Mine Project
Gogama -
Sagamok First Nation- Tree Clearing Project
Sagamok New School -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
Timiskaming Drinking Water Treatment System Replacement Project
Timiskaming Dam -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
Widjikiwe Gas Bar
Timiskaming -
Marina Construction Project
Kebaowek -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Matachewan New Housing Construction Project
Matachewan First Nation -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
Upper Beaver Gold Project
19 kilometres (km) east of Kirkland Lake -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
Kipawa Rare Earths Project
Kipawa -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
Kimball Cottage Decommission
Bruce Peninsula National Park of Canada -
Davis Cabin Relocation
Bruce Peninsula National Park of Canada -
Tobermory (Little Tub) Harbour - North and West Wall Rehabiliation
Tobermory -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
Zhiibaahaasing Water Storage and Distribution System Upgrades
Zhiibaahaasing Indian Reserve. No. 19 -
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
Gazoduq Project
Near Ramore -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park -
Century Gold Project
Timmins