Sagamok First Nation- Tree Clearing and School Construction Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Sagamok Anishnabek First Nation is presently examinig the feasability of building a new school in their territory. During the study, a location was determined which would be suitable for this new school. In order to potentially move forward with the construction at a later date, the community will need to clear trees from the lot to ensure minimal disruption of migratory birds in the area. A building will potentially be constructed, pending available funding, connected to propane gas, and have water serviced by the community water system. A septic system will also be installed, and hydro will be extended tot he lot line. At this time, it is estimated that the buildign will exceed 1,000m2.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Sagamok First Nation- Tree Clearing and School Construction Project | - | March 18, 2020 |
1 | Public Comment Period on Intent to Make a Determination | - | February 17, 2020 |
List all records
Contacts
Indigenous Service CanadaPhilip Stringer, Environment Officer
760 Notre Dame Ave
Unit M
Sudbury, Ontario P3A 2T4
Telephone: 705-522-3475
Fax: 705-677-7976
Email: philip.stringer@canada.ca
-
Location
- Sagamok New School (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2020-02-17 -
Proponent
Sagamok Anishnabek First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80485
Nearby assessments
..within 200 kilometres-
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
Zhiibaahaasing Water Storage and Distribution System Upgrades
Zhiibaahaasing Indian Reserve. No. 19 -
Victoria Mine Project
Southwest of Sudbury -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng By-Pass Road Construction
Naughton -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
Tobermory (Little Tub) Harbour - North and West Wall Rehabiliation
Tobermory -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Lion's Head Harbour Dredging Project - Spring 2021
Lion's Head Harbour -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Côté Gold Mine Project
Gogama -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Replacement of Drinking Water Pipes in the Block subdivision in the Village at Garden River First Nation
Garden River -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Portage Dam Concrete Storage Pad
Portage Dam -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
Wiarton Breakwater Replacement
Wiarton Launch Ramp -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
VLA Water Plant Replacement
Nipissing -
Removal of Timber Fender Floats
Sault Ste. Marie Canal National Historic Site -
Construction of Gazebo - Sault Ste. Marie Canal National Historic Site
Sault Ste. Marie Canal National Historic Site -
Great Lakes Power Ice Boom Timber Replacement
Sault Ste. Marie Canal National Historic Site -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
New Fibre Installation
Saugeen Indian Reserve No. 29 -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
Gros Cap Wharf Rehabilitation 2021
Gros Cap -
Batchewana - New Water Treatment Plant Construction in Goulais Mission
Goulais Mission -
Port Elgin Maintenance Dredging 2021
Port Elgin -
4th Canadian Divsion Training Centre (Meaford) North Shore Road Erosion Control
4th Canadian Division Training Centre (Meaford) -
10th Street Bridge Reconstruction, Owen Sound
Owen Sound -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay