Hard Surface Replacement
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Replace the existing interlocking and damaged concrete on the sidewalks, curbs and walkways. Addition of a ramp that is compliant with AODA requirements. New layout of the MI parking lot to improve barrier-free accessibility and increase the number of parking spaces involving repainting of parking lines and some repaving. Through the preliminary design phase of this project, it was determined that the footprint of the above noted areas exceeded 1,000m2 (Approximately 1240m2 for paved walkways, approximately 1700m2 for interlocking paving, and approximately 3800m2 for barrier free parking areas).
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | March 10, 2023 |
1 | Public Notice - Hard Surface Replacement | - | June 29, 2022 |
Contacts
Public Services and Procurement CanadaJoseph Nguyen, Environmental Specialist
Toronto, Ontario M3L 2B5
Telephone: 437-992-4353
Email: Joseph.Nguyen@pwgsc-tpsgc.gc.ca
-
Location
- 1050 Notre Dame Avenue, Sudbury, Ontario (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2022-06-29 -
Proponent
Public Services and Procurement Canada -
Authorities
- Public Services and Procurement Canada
-
Assessment Type
Project on federal lands -
Reference Number
83752
Nearby assessments
...within 200 kilometres-
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
Victoria Mine Project
Southwest of Sudbury -
Wahnapitae First Nation
Wahnapitae First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
VLA Water Plant Replacement
Nipissing -
Portage Dam Concrete Storage Pad
Portage Dam -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
Mnogin Constructed Wetland to Support Sustainable Water Treatment -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
Sagamok First Nation- Tree Clearing Project
Sagamok New School -
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
Energy East Project
North Bay -
Waste Transfer Station Construction
M'Chigeeng -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Latchford Dam - Public Safety Fencing
Latchford Dam -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
New Stoplog Lifter Latchford Dam
Latchford Dam -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
Côté Gold Mine Project
Gogama -
Haileybury Bin Wall Repairs - Summer 2021
Haileybury -
Timiskaming Drinking Water Treatment System Replacement Project
Timiskaming Dam -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
Kimball Cottage Decommission
Bruce Peninsula National Park of Canada -
Davis Cabin Relocation
Bruce Peninsula National Park of Canada -
Tobermory (Little Tub) Harbour - North and West Wall Rehabiliation
Tobermory -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park -
Marina Construction Project
Kebaowek -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
Zhiibaahaasing Water Storage and Distribution System Upgrades
Zhiibaahaasing Indian Reserve. No. 19 -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
Widjikiwe Gas Bar
Timiskaming -
Lion's Head Harbour Dredging Project - Spring 2021
Lion's Head Harbour -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Matachewan New Housing Construction Project
Matachewan First Nation -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Kipawa Rare Earths Project
Kipawa -
Wahta Mohawk Housing Subdivision Project
Wahta Mohawk -
Wahta Mohawks - Waste Transfer Station and Landfill Closure
Wahta Mohawks -
Wiarton Breakwater Replacement
Wiarton Launch Ramp -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation
Beausoleil First Nation Reserve