15 Lot Subdivision Expansion- Whitefish River First Nation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Whitefish River First Nation is a growing community in the Greater Sudbury area and is in need of new housing. In order to accommodate this growing need, the community is planning to develop 15 new houses within a subdivision within the reserve boundaries. As part of this project, a new subdivision will be designed for 15 homes, and includes tree clearing and paving of 930 meters of roadway, and laying 600 meters of watermain extension along the proposed new road. Turning lanes will be added to highway 6, inside the existing right of way, and will connect the new subdivision to the provincial highway system.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Comment Period on Intent to Make a Determination | - | January 10, 2022 |
Contacts
Indigenous Service CanadaPhilip Stringer, Environment Officer
760 Notre Dame Ave
Unit M
Sudbury, Ontario P3A 2T4
Telephone: 705-522-3475
Fax: 705-677-7976
Email: philip.stringer@canada.ca
-
Location
- Whitefish River First Nation (Ontario)
-
Nature of Activity
- Building and Property Development
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2022-01-10 -
Proponent
Indigenous Services Canada -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83284
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
New Fibre Installation
Project site 04: WHITEFISH RIVER INDIAN RESERVE NO. 4 -
New Fibre Installation
Project site 18: Sucker Creek Indian Reserve No.23 -
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
New Fibre Installation
Project site 17: Sheguandah Indian Reserve No.24 -
New Fibre Installation
Project site 05: WIKWEMIKONG UNCEDED RESERVE -
Sagamok Anishnawbek - Family Hub Complex Construction
Sagamok Anishnawbek -
Sagamok First Nation- Tree Clearing and School Construction Project
Sagamok New School -
Wikwemikong First Nation - Lot Servicing
Wikwemikong Unceded Territory -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
New Fibre Installation
Project site 12: WHITEFISH LAKE INDIAN RESERVE NO. 6 -
New Fibre Installation
Project site 11: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 06: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 10: WIKWEMIKONG UNCEDED RESERVE -
Waste Transfer Station Construction
M'Chigeeng -
New Fibre Installation
Project site 20: M'chigeeng Indian Reserve No. 22 -
Victoria Mine Project
Southwest of Sudbury -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek First Nation Business Park
Atikameksheng Anishnawbek First Nation -
New Fibre Installation
Project site 09: SERPENT RIVER INDIAN RESERVE NO. 7 -
New Fibre Installation
Project site 13: SERPENT RIVER INDIAN RESERVE NO. 7 -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Sheshegwaning Samson Edowishkosh Elementary School Construction
Sheshegwaning First Nation -
New Fibre Installation
Project site 16: Sheshegwaning Indian Reserve No.20 -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
Zhiibaahaasing Water Storage and Distribution System Upgrades
Zhiibaahaasing Indian Reserve. No. 19 -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
New Fibre Installation
Project site 15: Zubaahaasing Indian Reserve No. 19A -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Tobermory (Little Tub) Harbour - North and West Wall Rehabilitation
Tobermory -
Kimball Cottage Decommission
Bruce Peninsula National Park of Canada -
Davis Cabin Relocation
Bruce Peninsula National Park of Canada -
New Fibre Installation
Project site 03: MISSISSAGI RIVER INDIAN RESERVE NO. 8 -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park -
New Fibre Installation
Project site 19: Sagamok Indian Reserve -
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae First Nation
Wahnapitae First Nation -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Lion's Head Harbour Dredging Project - Spring 2021
Lion's Head Harbour -
New Fibre Installation
Project site 08: THESSALON INDIAN RESERVE NO. 12 -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Dokis First Nation Water Treatment Plant
Dokis First Nation -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Portage Dam Concrete Storage Pad
Portage Dam -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
New Fibre Installation
Project site 02: THESSALON INDIAN RESERVE NO. 12 -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Nipissing First Nation - Cultural Center Construction
Nipissing First Nation -
VLA Water Plant Replacement
Nipissing -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
Wiarton Breakwater Replacement
Wiarton Launch Ramp -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
Mnogin Constructed Wetland to Support Sustainable Water Treatment -
New Fibre Installation
Project site 14: St. Josephs Island Bird Sanctuary -
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
Côté Gold Mine Project
Gogama -
Fort Road Beaver Dam 2024, Fort St. Joseph National Historic Site
Fort St. Joseph National Historic Site -
New Fibre Installation
Project site 07: GARDEN RIVER INDIAN RESERVE NO. 14 -
New Fibre Installation
Saugeen Indian Reserve No. 29 -
Break Wall Repairs by private home owner - 318433 Grey Rd 1, Owen Sound Harbour, ON
Owen Sound Harbour -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
New Fibre Installation
Project site 01: GARDEN RIVER INDIAN RESERVE NO. 14 -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
Cassino Range Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Paardeberg Range Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
4th Canadian Division Training Centre (Meaford) North Shore Road Erosion Control
4th Canadian Division Training Centre (Meaford) -
New Fibre Installation
NIPISSING INDIAN RESERVE NO. 10 -
10th Street Bridge Reconstruction, Owen Sound
Owen Sound -
Energy East Project
North Bay -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
Port Elgin Maintenance Dredging 2021
Port Elgin -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Upgrade Underground Municipal Services - 22 Wing North Bay
22 Wing North Bay -
Meaford Harbour Fuel Tank System Installation - 2021
Meaford -
Meaford Harbour - Dock Expansion Project
Meaford -
Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation
Beausoleil First Nation Reserve -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Ininizhimo Transitional Housing Project
Garden River First Nation -
Replacement of Drinking Water Pipes in the Block subdivision in the Village at Garden River First Nation
Garden River -
Bruce C Nuclear Project
Kincardine -
Deep Geologic Repository Project for Low and Intermediate Level Radioactive Waste
Bruce Nuclear Site -
Thornbury Harbour Fuel System Removal and Replacement - 2021
Thornbury Harbour -
Thornbury West Pier Deck Repairs - 2021
Thornbury -
Wahta Mohawk Housing Subdivision Project
Wahta Mohawk -
YMCA Camp Queen Elizabeth Cabin Improvement Project
Georgian Bay Islands National Park -
Wahta Mohawks - Waste Transfer Station and Landfill Closure
Wahta Mohawks -
Impeed the Reed
Georgian Bay Islands National Park