Cross Lake Band of Indians - 14 Portable Classrooms
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The project consists of building 14 portable classrooms. The project site currently consists of a natural landscape, adjacent to an existing residential development and the Otter Nelson River School. In support of the project, WSP was retained to provide a geotechnical investigation, topographical survey, civil drawings (lot grading, drainage, access road, sewer and water), electrical performance specification, and foundation design for the portable classrooms. The building plans and specifications of the classrooms will be completed by another consulting firm.
Based on a previous geotechnical investigation WSP completed at a nearby property in support of another project, the potential frost penetration depth in the local area is about 3.4 metres.
WSP's scope of work on the project includes:
• Geotechnical assessment and report
• Civil design package that will include:
• Topographical survey
• Development of site plan with Owner input
• Site grading
• Sewer and water connecting to ONR Road
• Structural scope will include:
• Provide construction documents for a typical foundation for new 50'x23' portable classrooms (14 identical units)
• Provide one photo review during construction of completed reinforcing
• Review concrete reinforcing shop drawings
All hazardous waste and fuel contaminated waste will be dealt with as required by applicable codes and regulations. All nonhazardous waste will be disposed of in accordance with applicable codes, regulations and guidelines at a designated landfill site. Geotechnical reports completed for previous projects at Cross Lake found the dominant soil type was silty clay. Overburden materials commonly encountered included organics, clay/granular fill, silty clay, silt, and sand.
The project area is located within the Hayes River Upland ecodistrict of Manitoba. In the past, the project area consisted of a boreal forested natural state with wetlands. Currently the project site is an undeveloped natural area adjacent to Cross Lake, with a cleared gravel road with a residential area and school nearby. Previous geotechnical reports conducted within the vicinity of the project site identified the depth of groundwater to vary with water seepage identified during test pitting that ranged from near surface seepage to depth of 4.57 meters below ground surface to no seepage. Actual groundwater depths can vary seasonally and in response to major weather events. Raw drinking water for the Cross Lake community is obtained from Cross Lake (surface water) and treated at their water treatment plants.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
April 9, 2023 – The public period on the project is closed. Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Comment Period on Intent to Make a Determination | - | March 10, 2023 |
Contacts
Tebesi MosalaIndigenous Services Canada
Tebesi Mosala, Senior Environmental Specialist
200-365 Hargrave Street
Winnipeg, Manitoba R3C 4H4
Telephone: 204-984-0711
Fax: 204-983-2936
Email: tebesi.mosala@canada.ca
-
Location
- Cross Lake Band of Indians (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2023-03-10 -
Proponent
WSP -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84399
Nearby assessments
...within 200 kilometres-
CLCOI Road B Sewer and Water
Cross Lake Band of Indians -
Cross Lake Band of Indians Wastewater Lagoon Upgrade
Cross Lake -
Cross Lake Women's Shelter
Cross Lake Women's Shelter -
Cross Lake Youth Centre
Cross Lake Band of Indians -
Launch Ramp Reconstruction - Whiskey Jack Portage, MB - Fall 2021
Whiskey Jack Portage -
Norway House Cree Nation Business Center
Norway House Cree Nation -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Moody Road Development Municipal Servicing Project
Nishichawayasihk Cree Nation -
Nisichawayasihk Cree Nation Road Paving Project Phase 2
Nisichawayasihk Cree Nation Road Paving Project - Phase 2 -
Bunibonibee Cree Nation - 48 Unit Subdivision
Bunibonibee Cree Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
York Factory First Nation Remedial Actions Project
York Factory First Nation -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River First Nation - Community Wharf - 2022/2023
Poplar River First Nation -
Poplar River Bridge Replacement
Poplar River First Nation -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River First Nation School
Poplar River Manitoba School -
Project 4 — All-Season Road Connecting Berens River to Poplar River First Nation
-
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Project 6 — All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Poplar River First Nation
Poplar River First Nation -
York Factory First Nation Remedial Actions Project
York Factory First Nation -
Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021
Wasagamack First Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour