Muskrat Dam Lake First Nation - 25 Lot Subdivision Development

The Proposed Project

Muskrat Dam Lake First Nation is proposing the construction of a new subdivision (~33,250m2) consisting of 25 lots for the future construction of 25 multifamily residential duplexes (totaling 50 new houses). Project activities include:

Road Construction

  • Clearing, grubbing and leveling of road section;
  • Road will be 250 m long and 8 m wide and built in accordance with MTO standards;
  • 4:1 side slope with a minimum 0.75 m deep ditch with 3:1 ditch back slope; And
  • Site drainage and water diversion, and installation of new culverts along the road section.

Lot Development and Servicing

  • Clearing, grubbing and peat removal along the road right-of-way;
  • Construction of driveways for individual lots; And
  • Installation of water and sewer lines that will terminate 5 m past the front property line.

Water Main Distribution Extension

  • Installation of PVC watermain along the proposed subdivision, connecting the existing mainline; And
  • Fire hydrants to be installed at 150 m intervals along the proposed water main.

Wastewater Collection Extension

  • Installation of PVC sanitary main along the proposed subdivision for a gravity sewage system.

Hydro Extension

  • Extension of overhead transmission lines to future residential homes.

 

The construction of this subdivision will help alleviate some of the housing needs of the community that is currently experiencing a crisis due to the lack of suitable housing available to accommodate the community's growing population.

More


Latest update

Notice of Termination of Assessment

August 06, 2025 - Determination of environmental effects of the proposed Construction of 25 Housing Lots on Muskrat Dam Lake First Nation is no longer required as the Environmental Impact Assessment has been cancelled.

Participate

Contacts

Indigenous Services Canada
MaryJane Moses, Environment Officer
101-100 Anemki Place
Fort William First Nation, Ontario P7J 1A5
Telephone: 873-452-2426
Email: maryjane.moses@sac-isc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Muskrat Dam Lake (Ontario)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Terminated
  • Start Date

    2025-04-01
  • Proponent

    Muskrat Dam Lake First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    89392

Nearby assessments

...within 200 kilometres
Date modified: