Project Berth 1 foreshore remediation - PCT

  • Location (Berth 1 foreshore remediation - PCT, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88731
  • Last Modified: 2024-07-17
  • Relevance: 414.97
  • July 17, 2024 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Berth 1 foreshore remediation - PCT, located at 2300 Columbia Street, Port Moody, are likely to cause significant adverse environmental effects. To help inform this determination and a decision on whether or not to approve the proposed project, the Vancouver Fraser Port Authority is inviting comments from the public respecting that ...

Project Remotely Piloted Aircraft System (RPAS) Infrastructure Project - 19 Wing Comox

  • Location (19 Wing Comox, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88730
  • Last Modified: 2024-07-17
  • Relevance: 414.97
  • The Department of National Defence (DND) has proposed a project. The Project is to support the establishment of the Secondary Operating Base at Canadian Forces Base Comox. The Project will house three Remotely Piloted Aircraft (RPA) fully assembled, ready for operations configuration. The Project will involve construction of a hangar including: three (3) maintenance / storage bays, maintenance shops, and administrative areas to support the operation and maintenance of the remotely piloted ...

Project Rebuilding the administrative center in Cacouna

  • Location (WOLASTOQIYIK WAHSIPEKUK FIRST NATION, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88688
  • Last Modified: 2024-07-17
  • Relevance: 414.97
  • The project aims to rebuild the administrative center through total demolition and reconstruction of a new building. The project also includes the reorganization of the offices to adapt the new space for use by the Nation's members and committees. The new building will provide adequate accommodation for community members and employees. It will have three floors.   The planned surface area for these activities is approximately 300 m2.

Project Construction of a New Boat Ramp at Ranch Point, Canadian Forces Maritime Experimental and Test Ranges, Canadian Forces Base Esquimalt

  • Location (Canadian Forces Base Esquimalt, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88729
  • Last Modified: 2024-07-17
  • Relevance: 414.96
  • The Department of National Defence (DND) is proposing to construct a new boat ramp at Ranch Point, consisting of rock fill with a concrete landing and ramp, with armour rock for slope protection. It will be constructed on top of the existing substrate with no ground disturbance. The existing boat ramp became unusable following upgrades to the helicopter pad, and there is currently no operational boat ramp at Canadian Forces Maritime Experimental and Test Ranges (CFMETR), which results in ...

Project Construction Program for West Coast Depot, Canadian Forces Base Esquimalt

  • Location (Canadian Forces Base Esquimalt, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88728
  • Last Modified: 2024-07-17
  • Relevance: 414.96
  • The Department of National Defence (DND) has proposed a program that includes four construction projects associated with the West Coast Depot, located at the Canadian Forces Base Esquimalt Colwood Property. The four projects are: an Operations Building, a Support Building, a Security Kiosk Building and a New Compound.

Project Shackan - Sand and Gravel operation on Shackan IR11

  • Location (Shackan 11, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88623
  • Last Modified: 2024-07-17
  • Relevance: 414.92
  • Shackan proposes to develop a sand and gravel pit on Shackan IR 11 (the Project) to provide approximately 200,000 m3 of sand and gravel needed to rebuild sections of Highway 8.  An Environmental Impact Assessment was prepared to understand the potential for environmental effects associated with the project for consideration in the planning, design, and construction phases of the project. An Operational and Restoration Plan was prepared for pit development and operation methodology.

Project Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre

  • Location (Lake Manitoba First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88641
  • Last Modified: 2024-07-17
  • Relevance: 414.92
  • The scope of this project is to design and build a new prevention center in the east-central part of the community. The location is currently undeveloped, with plans to build a new school immediately north of the proposed site. The new space will be composed of a gymnasium, games room, visiting and programming spaces, as well as wellness and leisure areas. This project includes its water and wastewater. design and construction. The water service will involve the installation of an underground ...

Project Newfoundland and Labrador Hydro Line Modifications in Gros Morne National Park

  • Location (Gros Morne National Park of Canada, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87180
  • Last Modified: 2024-07-17
  • Relevance: 414.92
  • Newfoundland and Labrador Hydro (NL Hydro) is proposing to widen the Right of Way (ROW) corridors of five transmission lines that run through Gros Morne National Park. These lines are critical infrastructure, delivering electricity to national park facilities, enclave communities, and destinations north of the national park (i.e., over 9,000 customers). The transmission lines currently have higher service disruption rates than lines outside the park. During this five-year project, NL Hydro will ...

Project OS-6826 Authorization to extend an existing surface lease area for a multi-well pad

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88647
  • Last Modified: 2024-07-17
  • Relevance: 414.92
  • A surface lease extension consisting of 2.1 ha area for drilling and operating a multi-well pad will be constructed and maintained for the operating life of the wells, then decommissioned and reclaimed before the lease agreement is surrendered. The proposed surface lease extension will be to the adjacent to the east/southeast of an existing multi-well pad site. Some wetland impact will occur as a result of the padsite construction. Five wetlands were noted within 100m of the proposed wellsite ...

Project Wetland Restoration Program 2024-2025 and Crossing Removal

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88640
  • Last Modified: 2024-07-17
  • Relevance: 414.92
  • The purpose of these wetland restoration projects is to create and enhance wetland habitat within the matrix of farmland and natural areas in the northern sections of Rouge National Urban Park. Wetlands provide important habitat for many species in the park and contribute to improved water quality within the watershed. By slowing runoff from agricultural fields, wetlands act as filters, removing contaminants like concentrated nutrients, and allow for increased water infiltration to replenish ...

Project YVR North Runway Lighting Upgrades

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88727
  • Last Modified: 2024-07-16
  • Relevance: 414.89
  • The Vancouver Airport Authority is proposing enhancements to the electrical infrastructure for edge lights along the North Runway (Runway 08L-26R) at Vancouver International Airport (YVR). The project includes trenching new electrical ducting and pull-pits around the runway perimeter. The Airport Authority anticipates that construction for this proposed project will take place in summer and fall 2024, during the current nightly closure period for the North Runway.

Project Beardy's & Okemasis Cree Nation Stage 4 Subdivision

  • Location (Beardy's & Okemasis Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88564
  • Last Modified: 2024-07-16
  • Relevance: 414.89
  • The Beardy's & Okemasis Cree Nation Stage 4 Subdivision is proposing to construct 132 new residential lots to support future growth and housing on-reserve for the next 10 years. The Stage 4 Subdivision location was selected north and east of the Stage 3 Subdivision and will occupy approximately 82 hectares of land currently used for recreational and agricultural purposes. The project will include earthworks for lot grading and drainage and infrastructure for water, wastewater, roadway, ...

Project Beaver Lake Cree First Nation Cardinal Drive Subdivision

  • Location (Beaver Lake Cree Cardinal Drive Subdivision, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88635
  • Last Modified: 2024-07-16
  • Relevance: 414.87
  • Beaver Lake Cree Nation intends to build a new subdivision and residential lots to accommodate approximately 8 new houses, and future additional new houses as necessary, approximately 10 - 15 additional units.  The physical activities involved in the construction of the subdivision will primarily consist of earthworks for the general site and individual lot development including clearing and grubbing, topsoil striping and replacement, and site grading, as well as excavation for the ...

Project Timber harvesting on Block 7741 (CMTA)

  • Location (Block 7741 Military Training Area, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88712
  • Last Modified: 2024-07-16
  • Relevance: 414.86
  • Harvesting of timber damaged by the douglas fir beelte and understoy tree removal from mature douglas fir stands on Block 7741 The project consist in building temporary forestry roads, timber harvesting and temporary forestry road deactivation.  The main harvesting objective for douglas fir beetle blocks is the removal of green, red, and grey douglas-fir attacked by the douglas-fir beetle between 17.5 cm to 70.0 cm DBH. Any grey or red douglas-fir greater than 70.0 cm will not be ...

Project YUL Montreal-Trudeau International Airport- Extension of taxiways B and P

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88725
  • Last Modified: 2024-07-16
  • Relevance: 414.86
  • The project consists in the implementation of two taxiways along the North Runway (06L-24R): taxiways B and P. In order to maintain its facilities to reliability and safety standards, ADM must proceed with the reconstruction of a section of the apron and of taxiway F. However, taxiway F is frequently used by aircraft to taxi between the apron and the North Runway (06L-24R). The implementation of taxiways B and P as substitutes for taxiway F will allow aircraft to circulate while the work ...

Project Dismantling the temporary housing camp at La Pipe Lake

  • Location (La Mauricie National Park of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88724
  • Last Modified: 2024-07-16
  • Relevance: 414.86
  • The project includes the dismantling of the temporary accommodation camp at La Pipe Lake, the adjoining temporary facilities (shelters, dock, walkways, backcountry helipad), and the repatriation of material, equipment and materials to the frontcountry (for disposal or reuse). This rustic camp, which was built to facilitate access to the La Pipe Lake area as part of the aquatic ecosystem restoration program, has not been used since work in this area was completed. The dry pit privy and grey ...

Project Portobello Creek National Wildlife Area, New Brunswick - Coldspring Lead Wetland Naturalization Project

  • Location (Portobello Creek National Wildlife Area, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88722
  • Last Modified: 2024-07-16
  • Relevance: 414.85
  • Ducks Unlimited Canada proposes to naturalize the freshwater Coldspring Lead impoundment that was constructed in 1992. By naturalizing this impoundment, the proponent proposes to restore the original hydrology connecting of Coldspring Lead Brook which flows into the Portobello stream. The scope of the project will include removal of the water control structure that is present and breach the berm in two locations to return this project site to its natural pre-construction (1992) state. These ...

Project Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II

  • Location (Montreal Lake IR 106B, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88643
  • Last Modified: 2024-07-16
  • Relevance: 414.81
  • Montreal Lake Cree Nation is proposing to construct Phase II of a new subdivision development. The project will consist of construction of 102 lots on 30 ha of land. The project includes underground utility installations, site roadways and ditching, and lot grading. The proposed site is located approximately 2 km southeast of the community core area, and borders the existing phase 1 Bittern Lake subdivision.   The existing land use of the proposed subdivision site is classified as ...

Project Camp for Ekuanitshit guardians

  • Location (Mingan Archipelago National Park Reserve of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88723
  • Last Modified: 2024-07-15
  • Relevance: 414.78
  • The project aims to promote the transmission of the cultural and traditional knowledge of the Inuit community of Ekuanitshit as part of the Indigenous Guardians Project. Implementation of the project, which will begin in the fall of 2024, will result in the creation of a gathering place for these exchanges on Île à Bouleau du Large (BOUL), located in the Mingan Archipelago National Park Reserve. The infrastructure planned for the island will include three camping sites on wooden ...

Project Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB

  • Location (Poplar River, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87356
  • Last Modified: 2024-07-15
  • Relevance: 414.77
  • Poplar River First Nation is proposing to add a 2 element dipole antenna to the radiocommunication tower at Poplar River. The new antenna will be used as part of a Very High Frequency (VHF) communication system used by the band. The antenna will be mounted at 10.7m above ground level. In the future, the tower may have other antennas and other radiocommunication equipment added or replaced.

Project Parking lot replacement at RCMP Detachment in Innisfail, Alberta

  • Location (Innisfail, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85721
  • Last Modified: 2024-07-15
  • Relevance: 414.76
  • The RCMP is proposing to replace two parking lots designated for staff (1325m2) and visitor parking (275m2) at the Innisfail, Alberta Detachment. Project will involve the removal of current asphalt and bollards, re-grading of parking area, replacement of asphalt and bollards, and painting of parking lot for stalls and designated parking.

Project Berens River Bridge Replacement

  • Location (Berens River First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84111
  • Last Modified: 2024-07-15
  • Relevance: 414.76
  • The Berens River First Nation (BRFN), Band No. 266 is proposing to replace the existing bridge across Berens River with a new, 72 m clear-span bridge. The bridge replacement project is part of the improvements being made to the all-season road (English Road Extension Project) and will be designed to create a safer, longer lasting structure for the BRFN community. The location of the bridge replacement project is over the Berens River near the east shore of Lake Winnipeg. The site is ...

Project Yellow Quill First Nation New Subdivision

  • Location (Yellow Quill IR 90, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88626
  • Last Modified: 2024-07-15
  • Relevance: 414.76
  • Yellow Quill First Nation is proposing to construct a new subdivision northwest of the community core area on approximately 35 hectares of land currently used for agricultural purposes. The proposed subdivision will consist of 40 new residential lots. The project will include site preparation activities such as topsoil stripping and earthworks required for lot grading and drainage, installation of underground utilities and roadway construction.

Project Timber harvesting on Hustalen IR #1 Adams Lake

  • Location (Hustalen #1, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88631
  • Last Modified: 2024-07-14
  • Relevance: 414.59
  • The Bush Creek Fire, summer 2023, damaged timber on part of Hustalen IR #1.  The Adams Lake Nation requested a timber permit issued under section 5 of the Indian Timber Regulation to cut and sale the damaged timber. The damaged timber will be harvested using a ground base system. 1: The construction of a 450 m. fireguard.  2: The construction of of a 460 m. new permanent access road. 3: The construction and deactivation of 450 m. of temporary skid trails, 4: the construction and ...

Project Essential Radar Telecom Modernization Toronto Fiber Installation

  • Location (Nav Canada Fibre Location, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88637
  • Last Modified: 2024-07-14
  • Relevance: 414.59
  • NAV CANADA is planning to replace existing degraded copper cables between the Toronto Radar Site and the Runway 23 LOC at the Toronto Pearson International Airport.  The Project will consist of the installation of approximately 1.9 km of new fibre optic cable on the existing airport property from the receiver site on the west side of the West Service Road north of Courtneypark Drive East and terminate at the Runway 23 Localizer east of Dixie Road. 1.9 km of the new cabling will be ...

Project Entrance Breakwater and Shore Protection Reconstruction at the North Rustico Small Craft Harbour, Prince Edward Island

  • Location (North Rustico, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88625
  • Last Modified: 2024-07-13
  • Relevance: 414.48
  • The existing entrance breakwater structure at the North Rustico Small Craft Harbour has deteriorated to the point whereby reconstruction is required.  The proposed project will see the partial demolition and full encapsulation of breakwater structures #301, #302, and #303 using a combination of steel sheet pile and armour stone.  The new breakwater will be raised approximately 2 metres. Shore protection (structure #603) will also be reconstructed by placing layers of filter and armour ...

Project Wharf Upgrades and Launching Ramp Reconstruction at the Covehead Small Craft Harbour, Prince Edward Island

  • Location (Covehead, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88624
  • Last Modified: 2024-07-13
  • Relevance: 414.48
  • Post-tropical storm Fiona damaged the wharf infrastructure at the Covehead Fisheries and Oceans Canada - Small Craft Harbour. The proposed project will include the reconstruction of existing wharf and launching ramp structures. Wharf structure #603 will be removed and reconstructed with steel sheet pile and armour stone shore protection; wharf structure #403 will be removed and replaced with steel sheet pile; and wharf structure #405 will be removed and reconstructed with a new cope wall.  ...

Project Extension of Amisk Street in Opitciwan

  • Location (Opitciwan, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88634
  • Last Modified: 2024-07-13
  • Relevance: 414.48
  • The project is located in Opitciwan and consists of the extension of Amisk Street, as well as the construction of Mikisiw, Warwick, EO-1, EO-3 and EO-4 Streets to serve 1 backflow station lot and 111 low- and medium-density residential lots. The project will also enable the construction of servitude pipelines. The project is divided into two construction phases. The first phase of construction in 2024 will have a surface area of ±51,000 m2. The second construction phase in 2026 will ...

Project Wharf Removal and Breakwater Reconstruction at the Red Head Small Craft Harbour, Prince Edward Island

  • Location (Red Head, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88627
  • Last Modified: 2024-07-13
  • Relevance: 414.48
  • Post-tropical storm Fiona damaged the breakwater and wharf structures at the Red Head Small Craft Harbour. The proposed project will include the removal of wharf structures #408 and #410 and the reconstruction of breakwater structure #601. The existing breakwater will be dismantled and reconstructed to a crest elevation 1.5 meters higher than the existing structure. To facilitate the increased elevation, the footprint of the breakwater will be increased. The reconstructed breakwater will also ...

Project Rouge National Urban Park Cistern Decommissioning

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88633
  • Last Modified: 2024-07-13
  • Relevance: 414.48
  • Rouge National Urban Park is planning to decommission an unused open cistern for health and safety reasons and convert it to a snake hibernaculum. Eastern Milksnakes are known to overwinter in the rock wall foundation adjacent to the cistern and therefore the site is sensitive to construction activities. The cistern will be pumped and backfilled with stone to create habitat that will allow snakes to move throughout the structure. This project will be scheduled to avoid sensitive timing periods ...

Project Clear Lake Pier Repairs

  • Location (Riding Mountain National Park of Canada, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87161
  • Last Modified: 2024-07-12
  • Relevance: 414.45
  • The Clear Lake Pier has experienced erosion on the eastern side and requires repairs and future protection. Large rip rap will be placed along the west and north sides of the existing pier. Native vegetation will also be planted to reinforce the soil and enhance habitat for various species in the area.

Project Repair of the Sorel wharf

  • Location (Sorel Warf, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88721
  • Last Modified: 2024-07-12
  • Relevance: 414.44
  • In October 2021, the Sorel-Tracy – Saint-Ignace-de-Loyola ferry (Société des traversiers du Québec) collided with the Sorel wharf. The Real Property, Environment, Safety and Health Directorate of Fisheries and Oceans Canada (DFO) plans to carry out repair work at the site of the damage caused by the ferry in order to maintain the integrity of this maritime structure.

Project Hollow Water First Nation Prevention Centre

  • Location (Hollow Water First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88720
  • Last Modified: 2024-07-12
  • Relevance: 414.44
  • 1985 m2 Prevention Centre Building centrally located on the south side of the adjacent band administration office parking lot. Comes with a 2,250 ft2 garage, 1,876 ft2 outdoor space and proposed 33,983 ft2 parking lot. The site has water sewer line running parellel along the band office parking lot. It will be connected to main water sewer line. The current land use of the site is as a housing material lay down area. 

Project Kitchenuhmaykoosib Inninuwug Wastewater System Upgrades & Expansion

  • Location (Kitchenuhmaykoosib Inninuwug First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88716
  • Last Modified: 2024-07-12
  • Relevance: 414.44
  • Kitchenuhmaykoosib Inninuwug First Nation proposes to construct and operate a new sewage lagoon on the mainland; expand and upgrade the existing lagoon on Post Island; upgrade the existing lift stations on Post Island; and, construct a wastewater collection system for the mainland, including new lift stations, forcemain, gravity sewer, outflow pipe, sanitary manholes and service connections to the existing housing.

Project PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill

  • Location (Tower Hill, MB, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88719
  • Last Modified: 2024-07-12
  • Relevance: 414.43
  •   Parks Canada Agency Addition of New Site Known as Tower Hill A new 48 foot high VHF tower will be installed in the west end of the park using screw piles. Vehicle and medium duty equipment will access the area using Central Trail. This project will be assessed using a Basic Impact assessment. The new site will improve communications for Law Enforcement, Public Safety, Wildlife Management and staff occupational health and safety. In the future, the new tower may have other antennas ...

Project Shoal Lake Cree Nation Lagoon Upgrades

  • Location (Shoal Lake Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88718
  • Last Modified: 2024-07-12
  • Relevance: 414.43
  • Shoal Lake Cree Nation is proposing to upgrade existing sewage collection and treatment infrastructure. The project includes of construction of a new facultative lagoon, with a 4.36 hectare sized primary cell and a storage cell sized to 90,880 cubic metres capacity. The new lagoon will be located approximately 2 kilometres southeast of the community core area. The project also includes construction of approximately 450 m of new roadway to provide access to the lagoon from the existing roadway ...

Project uniting TOwards Gender Equality for enjoyment of women's and girls' Total HEalth and Rights

  • Location (Kakuma-Lopacho Village, Turkana County, Kenya, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 88717
  • Last Modified: 2024-07-12
  • Relevance: 414.42
  • The Adventist Development and Relief Agency (ADRA International) is undertaking a project in Kenya entitled TOGETHER (uniting TOwards Gender Equality for enjoyment of women's and girl's Total HEalth and Rights).  The project aims to increase the enjoyment of health-related rights for the most vulnerable children, adolescent girls, and women.  One of the project components is the constructon of a borehole in Kakuma-Lopacho village in Turkana County.  The borehole will be ...

Project Hollow Water First Nation Transitional Spaces

  • Location (Hollow Water First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88715
  • Last Modified: 2024-07-12
  • Relevance: 414.41
  • 855 m2 transitional housing building located at the end of Shawanim Abinooji Drive which services Shawanim Abinooji group homes. Transitional housing comes with a 1,300 ft2 garage, 940 ft2 outdoor space and proposed 27,550 ft2 of parking lot. The site has water and LP swer line running parallel along Shawanim Drive. A service extension will connect to main water and Low Pressure sewer. Facility will have 7 family units (25 people), 3 staff units (3-6 people).  

Project Asphalt and Concrete Walkway Repairs

  • Location (580 and 588 Booth Street, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88620
  • Last Modified: 2024-07-12
  • Relevance: 414.37
  • This project will consist of repairs to existing asphalt walkways located on the northern, eastern and southern perimeter of the existing buildings of both 580 Booth St. and 588 Booth St. The existing walkway has and continues to deteriorate. It now represents a Health & Safety hazard to potential users and can no longer be considered accessible. The pathways are to be assessed by a landscape architect. Recommendations for repair options will be made to PSPC and the landscape architect. ...

Project Rebuilt of breakwater 302 at Étang-du-Nord harbour, Magdalen Islands

  • Location (Étant-du-Nord harbour, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86006
  • Last Modified: 2024-07-12
  • Relevance: 414.37
  • Due to the age of the structure, the nature of the stone used in its construction, and the increasing intensity and frequency of storms, breakwater #302 at the Étang-du-Nord fishing harbour needs to be rebuilt. The current state of the breakwater does not offer adequate protection, and overtopping can occur during strong winds. This can pose a risk to harbour users and cause damage to harbour infrastructure or ships moored at the quays. The breakwater will be rebuilt in the same ...

Project Building demolition

  • Location (Building demolition, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88636
  • Last Modified: 2024-07-12
  • Relevance: 414.37
  • The proposed project The Vancouver Fraser Port Authority – Planning and Development, are proposing to demolish a multi-structure facility located at 7028 York Road, Richmond, which was once a bio energy facility. The structures to be demolished and removed include, but are not limited to: Utilities, including, gas, water, sanitary, communication and electrical services Buildings and structures including, a two-level office, pre-treatment building, percolation building, ...

Project Loading dock fit-up at Dominion Sculptor Workshop

  • Location (Macoun Centre, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88619
  • Last Modified: 2024-07-12
  • Relevance: 414.37
  • The project consists of the fit-up of an existing loading dock to house a production shop for the Dominion Sculptor at the Macoun Centre at Pink Road in Gatineau, QC., and will include capacity for 8-10 sculptors in 295 sqm of space including an exterior workspace. This new production will be a place where the Dominion Sculptor's will be able to do stone carving. The majority of the work has focused on delivering the historical sculpture program of adding new carvings to the walls of Centre ...

Project Yellow Quill First Nation Wastewater Infrastructure Upgrades

  • Location (Yellow Quill IR 90, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88628
  • Last Modified: 2024-07-12
  • Relevance: 414.37
  • Yellow Quill First Nation is proposing an infrastructure upgrade project that consists of construction of a new lagoon, access road, and force main installations. The proposed lagoon site is located approximately 3.5 km north of the community core area on land currently used for agricultural purposes. A new facultative lagoon with a 3.89 ha sized primary cell and a storage cell sized with a capacity of 56,370 cubic metres will be constructed, along with approximately 1.3 km of newly constructed ...

Project City of Kawartha Lakes - Repair of Existing Stormwater Outlet

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88714
  • Last Modified: 2024-07-11
  • Relevance: 414.34
  • As part of the Old Mill Park reconstruction project, the activity is the repair of an existing storm water outlet in proximity to Scugog River. The project involves stabilizing the adjacent bank and placing of 4mx4m of riprap/rock on the bed in order to provide erosion protection for the outlet.

Project Repair of sector doors

  • Location (Chambly Canal National Historic Site of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88713
  • Last Modified: 2024-07-11
  • Relevance: 414.34
  • The aim of the project is to restore the security gates at the Chambly Canal National Historic Site by carrying out civil and mechanical work to bring them back into working order. This will ensure the preservation of their integrity while supporting boating activities on the site for seasons to come. The work includes dewatering the work area, removing sector gates, demolishing and rebuilding concrete, removing sediment and debris, painting, and replacing several old mechanical structures.

Project Fort McKay First Nation: 2023/24 Residential Redevelopment Project

  • Location (Fort McKay First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87392
  • Last Modified: 2024-07-11
  • Relevance: 414.33
  • Fort McKay First Nation is proposing the demolishing of twelve existing residential homes and the subsequent construction of 32 new residential homes within the community of Fort McKay on their lands at IR No. 174. Residential debris generated in the demolition and construction processes is being temporarily stored at the Fort McKay waste management site in IR 174D before being relocated the Regional Municipality of Wood Buffalo municipal landfill. The project footprint is sited on existing ...

Project Novador Gold Mine Project

  • Location (Val d'Or, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 86020
  • Last Modified: 2024-07-11
  • Relevance: 414.32
  • Probe Gold Inc. is proposing the construction and operation of a new open-pit and underground gold mine, located about 25 kilometres east of Val-d'Or, in Quebec. As proposed, the Novador Gold Mine Project would have a maximum ore production capacity of 24,000 tonnes per day with an estimated lifespan of 12.5 years. The project would include an ore processing plant, access roads, waste rock and overburden piles, and a tailings storage facility.