Bridge Replacement, Takla Lake, Burns Lake

Proposed project includes bridge installation and associated upgrades to the road approaches. The exisiting bridge structure is no longer safe for use. The new bridge will be installed following road upgrades from Takla Lake Ferry Landing IR 9 to the crossing. The new bridge structure will restore access to the land  within the IR. Proposed works will include the removal of the existing bridge and installation of a 21.336 m steel girder/timber deck bridge on log cribs over an inlet of the west arm of Takla Lake (watershed code (WSC):182-819600-63300). 

It is anticipated that works will be completed in the fall/winter of 2022 when the inlet is anticipated to have minimal water volume and will take 7-10 days to complete. Construction works are anticipated to include the following proposed activities: 

  • Mobilization to site, delivery of new bridge
  • Removal of the existing bridge structure 
  • Vegetation clearing and grubbing 
  • Excavation of sill logs;
  • Bridge installation 
  • Road approach works 
  • Site remediation

 

More


Latest update

The assessment is in progress.

Participate

Contacts

Ashley Smith
Indigenous Services Canada
Ashley Smith, Senior Environmental Specialist
600-1138 Melville Street, BC V6E4S3
Vancouver, British Columbia V2X 8L2
Telephone: 236-334-7336
Email: ashley.smith@sac-isc.gc.ca


  • Location

    • Takla Lake (British Columbia)
  • Nature of Activity

    • Bridges
  • Assessment Status

    In progress
  • Start Date

    2022-09-21
  • Proponent

    Takla Nation
  • Authorities

    • Fisheries and Oceans Canada
    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83990