15-8-17-6 Installation of a Gas Pipeline

IPC Canada Ltd. is proposing to install a gas pipeline on an existing facility site with CFB Suffield. This operations project is in support of existing fluid streams currently handled at the facility. The 2 inch plastic pipeline is approximately 80 metres long, will be trenched, and does not require new lands as it is contained within a developed and previously assessed facility site. The installation will be completed in approximately two days in association with other operational facility work.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

May 18, 2021 – The public comment period on the project is closed. The Department of National Defence is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

List all records

Contacts

IPC Canada Ltd.
Joel Heese, Environment and Regulatory Advisor
1711 Broadway Ave East
Redcliff, Alberta T0J 2P0
Telephone: 403-580-7803
Email: joel.heese@international-petroleum.com

Department of National Defence
Danny Laganiere, Base Environmental Officer, CFB Suffield
CFB Suffield, Post Office Box 6000 Station Main
Medicine Hat, Alberta T1A 8K8
Email: Danny.Laganiere@forces.gc.ca


  • Location

    • CFB Suffield, Medicine Hat (Alberta)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    In progress
  • Start Date

    2021-04-28
  • Proponent

    IPC Canada Ltd.
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    81580

Nearby assessments

..within 200 kilometres
Date modified: