Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Simpcw Community Centre will be located about 15km north of Barriére, BC, and 84km north of Kamloops, BC. It is located on the North Thompson 1 reserve, currently home to approximately 90% of Simpcw's registered on-reserve population. The proposed Simpcw Community Centre will include program areas of: Elementary School, Early Learning Centre/Childcare, Gymnasium/ Community Hall, Wellness, Administration, and Natural Resource Department. It will be a two-storey facility using a hybrid structural system of wood frame and heavy timber construction.
Following services will be provided on site:
- Building sewer line will be connected to a septic tank and septic field.
- Propane tanks
- A diesel fuel tank for an emergency generator
This is a brownfield site that housed an administrative building for the last 40-50 years.
Species at Risk:
The American badger (Taxidea taxus) is mapped by the BC Conservation Data Centre within the project area. It is provincially red-listed and federally identified under SARA as Endangered. American badger have distinctive head markings, including a white stripe that runs down the top of their head and black markings on their face. It resides in grasslands, shrub-steppe, and dry open forest. American badger dig in soils for prey
Badgers utilize burrows for resting, foraging, food storage, giving birth, and raising young. They dig their burrows in firm soils that won't cause a collapse. Burrows are built on flat to steep terrain and identified by their elliptical shape and mound of dirt at the entrance. They are between 20cm and 30cm wide and 15 to 25cm deep and often have claw marks around the entrance.
Given that the proposed construction footprint is previously disturbed, with much of it paved or previously built on, it is unlikely that American badger use the site for denning or hunting. However, before construction begins, badger burrows should be searched for along access routes and grassy areas. If a badger burrow is discovered, it should remain untouched and the BC Conservation Data Centre should be notified.
Migratory Birds
It is unknown if migratory birds use the area during the year. Since no trees, and only two shrubs, are proposed to be cleared, works are unlikely to disturb migratory birds.
There is potential for one Saskatoon berry shrub and one ornamental shrub to be removed. If this clearing is proposed within the migratory bird breeding window (April 1 to August 15) a biologist will complete a nest survey prior to the shrubs being removed. If nests are found, they will not be removed or damaged and the nesting pair will be allowed to remain in the nest until the young have fledged.
Fish or Fish Habitat
The closest mapped water body is Newhykulston Creek, which is 160m away from the project site. Thompson River is 520m away. Their proximity to the project area eliminates foreseeable impacts to fish and fish habitat in these water bodies. During construction, the contractor should ensure that water is not discharged into a watercourse (ex. river or stream) or waterbody (wetland, pond, lake).
Predominant vegetation on or adjacent to the site
Predominant vegetation on the site includes lawn grass (Zoysia spp.), cherry (Prunus spp.), stonecrop (Crassula spp.), umbellifer (Apiaceae spp.) and Saskatoon berry (Amelanchier alnifolia). Vegetation surrounding the project are includes species typical to a Douglas fir (Pseudotsuga menziesii) forest in the Interior Douglas fir biogeoclimatic zone (IDF).
Plant species at risk on or adjacent to the proposed project area
Although plant species at risk were not identified within the project area, the Mexican Mosquito-fern (Azolla Mexicana), has been mapped 5 km from the project site by the Conservation Data Centre. This fern is provincially blue-listed and federally identified as threatened under SARA but is unlikely to volunteer within the project area due to the disturbed conditions and lack of suitable habitat. If it is observed on site, it should be left undisturbed and reported to the CDC.
Note: Based on the information provided by Simpcw and their consultant, Unison Architecture.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
is not likely to cause significant adverse environmental effects..
Participate
Contacts
Indigenous Services CanadaFasih Siddiqui, Senior Engineer
1138 Melville Street
Vancouver, British Columbia V6E 4S3
Telephone: 604-376-0802
Fax: 604-775-7149
Email: Fasih.Siddiqui@sac-isc.gc.ca
-
Location
- Simpcw First Nation, North Thompson 1 (British Columbia)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2021-10-20 -
Proponent
Simpcw First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83106
Nearby assessments
...within 200 kilometres-
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Harper Creek Mine Project
Vavenby -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
North Thompson Rail Terminal Development Project
Kamloops -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 165
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Tk'emlúps te Secwe?pemc CLC Stormwater Detention Facility
Kamloops 1 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Harper Creek Mine Project
Kamloops -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Affordable Housing Units
Adams Lake Indian Band -
Ruddock Creek Mine Project
Avola -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Okanagan -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
New Fibre Installation
Canoe Creek IR#2 -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Parking Lot repave
301 3rd Street West, Revelstoke -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
New Fibre Installation
Nooaitch -
Cayoose Creek Water System Connection to Village of Lilloet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
New Telus Communications Inc. Telecommunication Tower Project in Dog Creek 1 Reserve on Stswecem'c Xget'tem Nation Lands
Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Esk'Etemc First Nation Road and Drainage Improvements (Alkali Lake)
Alkali Lake 1; Swan Lake 3; and Alkali Lake 4A -
New Telus Communications Inc. Telecommunication Tower Project in Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands
Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Williams Lake First Nation Community Playground Project
Williams Lake First Nation Community Playground Project -
New Fibre Installation
James Louie 3A Reserve (Williams Lake First Nation) -
New Fibre Installation
Coldwater -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Spanish Mountain Gold Project
70 kilometres northeast of Williams Lake -
Spanish Mountain Gold Mine Project
70 kilometres northeast of Williams Lake -
Kingsvale-Oliver Reinforcement Project
Kingsvale -
Construction of a Cattle Exclusion Snake Fence - 3rd Canadian Division Support Base
3rd Canadian Division Support Base -
AIB reservoir Construction
Ashcroft -
Telus Communications Inc., new radiocommunications tower (BC105333) on Toosey I.R. No. 1, near Riske Creek, BC.
BC105333 - Toosey I.R. No. 1 -
Speyum Creek Watercourse Restoration
Speyum Creek -
Hazard Spruce Tree Removal
Glacier National Park -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
N'Quatqua-Wastewater and Sludge Management
07991 - NEQUATQUE 1-75805CLSRBC / 75667CLSRBC -
N'Quatqua Watermain Extension and Phase 1 Subdivision
N'Quatqua IR#1 -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest
Lot 7741 -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741 -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park