Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Public Comments Invited – Start of Public Comments Period
Notice of intent to make a determination
Harvesting of burnt timber, on CHUM CR07179 & SCOTCH CREEK 4 07181, by the summer 2023 forest fire
June 11, 2024, Indigenous Services Canada must determine whether the harvesting of burnt timber on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181 is likely to cause significant adverse environmental effects.
The project consist in building permanent and temporary forestry roads, timber harvesting and the deactivation of the temporary forest roads.
To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.
Written comments must be submitted by July 15, 2024 to:
Alexandre Vignola
Alexandre.Vignola@sac-isc.gc.ca
Latest update
Participate
Contacts
ALEXANDRE VIGNOLA600-1138 Melville Street
Vancouver, BC.
Vancouver, British Columbia V8B 0X4
Telephone: 604-363-2763
Email: alexandre.vignola@sac-isc.gc.ca
-
Location
- CHUM CREEK 2 07179 (British Columbia)
- SCOTCH CREEK 4 07181 (British Columbia)
-
Nature of Activity
- Forestry
-
Assessment Status
In progress -
Start Date
2024-07-15 -
Proponent
Skwlax Timber Partnership Limited -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
88617
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Affordable Housing Units
Adams Lake Indian Band -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
New Fibre Installation
Project site 1: Enderby 2 -
New Fibre Installation
Project site 2: Salmon River -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
New Fibre Installation
Okanagan -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
North Thompson Rail Terminal Development Project
Kamloops -
Ajax Mine Project
Kamloops -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Harper Creek Mine Project
Vavenby -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Parking Lot repave
301 3rd Street West, Revelstoke -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Ruddock Creek Mine Project
Avola -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
New Fibre Installation
Nooaitch -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Hazard Spruce Tree Removal
Glacier National Park -
New Fibre Installation
Coldwater -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Penticton Airport - North Apron Expansion
Penticton -
Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Princeton Detachment Replacement
Princeton -
Speyum Creek Watercourse Restoration
Speyum Creek -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
New Fibre Installation
Canoe Creek IR#2 -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Revision to the Posting for IAA Reference Number 85749 (Canoe Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Canoe Creek/Meadow Lake
Stswecem'c Xget'tem First Nation -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1