Penticton Indian Band Sage Road 24 Lot Subdivision
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The purpose of the Penticton Indian Band 24 lot Sage Road subdivision is to address the extreme housing shortage within the community. This project serves as the first phase of land development near the Westhills area, with the goal of creating safe, healthy, and affordable housing for band members. The Penticton Indian Band is committed to supporting the growing community by providing much-needed housing, as the wait list for housing currently exceeds 150 members, both on and off reserve. This project will help to alleviate the housing crisis and improve the quality of life for band members by providing a sustainable, long-term solution to the housing shortage.
Development of a 24 residential lot subdivision at Penticton Indian Band IR 1. Physical works of the project will include new road alignment and design, new watermain installation, stormwater infrastructure installation, power and street light services as well as the addition of the 24 lot residential development. After an initial lot review with PIB considering these constraints, it was decided that the best course of action was to extend the road 180 meters before loading the lots on either side of the new road. Thus, Sage Road was extended to Westhill Road with a road ROW of 20 metres.The purpose of the project is to provide much needed housing for the residents of Penticton Indian Band IR 1. The capacity of the project includes 24 individual lots. Land area required for the project is approximately 3 hectares in size.
Latest update
Participate
Contacts
Kevin Vollmer, Senior Engineer1138 Melville St.
Vancouver, British Columbia V6E 4S3
Telephone: 604-817-1305
Email: kevin.vollmer@sac-isc.gc.ca
-
Location
- Penticton Indian Band 24 Lot Sage Road Subdivision Development (British Columbia)
-
Nature of Activity
- Building and Property Development
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2023-12-20 -
Proponent
Penticton Indian Band -
Authorities
- Environment and Climate Change Canada
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87179
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Penticton Airport - Lot 28 - Granite Developments Ltd - Construction of 11 Private Hangars
Penticton -
Penticton Airport - North Apron Expansion
Penticton -
Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Kingsvale-Oliver Reinforcement Project
Oliver -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
Princeton Detachment Replacement
Princeton -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Kingsvale-Oliver Reinforcement Project
Kingsvale -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
New Fibre Installation
Okanagan -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
New Fibre Installation
Coldwater -
New Fibre Installation
Project site 2: Salmon River -
New Fibre Installation
Project site 1: Enderby 2 -
New Fibre Installation
Nooaitch -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
Affordable Housing Units
Adams Lake Indian Band -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
Harper Creek Mine Project
Kamloops -
Tk'emlúps te Secwe?pemc CLC Stormwater Detention Facility
Kamloops 1 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlups Commercial Complex Lot 165
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
New Fibre Installation
TteS West Tkemlups -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Speyum Creek Watercourse Restoration
Speyum Creek -
Debris Deflector Installation
Debris Deflector Installation -
Annacis Water Main No. 2 Scour Protection project
Annacis Water Main No. 2 Scour Protection project -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
North Thompson Rail Terminal Development Project
Kamloops -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Peters First Nation - Fraser River Flood Control Berm
Peters First Nation, British Columbia -
Vito Shipyards Wharf Repairs - Extension to the Expiry Date - Public comments invited
Vito Shipyards Wharf Repairs - Extension to the Expiry Date -
Peters First Nation Gravel Pit Activation
Peters IR 1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Seabird Island Indian Band - Seabird Island Community and Cultural Centre
Seabird Island Indian Band - Seabird Island Community and Cultural Centre -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Kwikwexwelhp Healing Lodge Access Road Repair and Re-grading
Kwikwexwelhp Healing Lodge -
Skowkale / Yakweakwioose; Subdivision Preloading
08059 -YAKWEAKWIOOSE 12 -
Yakweakwioose First Nation Stormwater Outfall
Yakweakwioose 12 I.R. -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Stormwater Outflow into Chilliwack Creek
Skowkale 10.1.R. -
Skowkale / Yakweakwioose; Subdivision Preloading
08049 - SKOWKALE10 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
SAY Community Centre
Skowkale No. 10 Reserve Land -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Bivouac Site, OPSEE Training Area
OPSEE Training Area, Vance road, Cultus Lake -
Sq'éwlets Cultural and Recreational Multi-use Trail Project
Squawkum Creek No.3 -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Sq'ewlets - Squawkum Creek IR#3 Water System Upgrade
Squawkum Creek IR#3 -
Aitchelitz Stormwater Outfall
Aitchelitz First Nation -
Road Realignment and Culvert Installation - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Cultus Lake Septic Upgrade Project
Cultus Lake Laboratory -
Ministry of Transportation and Infrastructure - Culvert Replacement Columbia Valley Road
The Cultus Lake Laboratory -
Nicomen Dike upgrade - Skumulsph IR 16
Athey Road, Nicomen Dike, Skumulsph IR 16 -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Deroche Creek Long Term Solutions
Deroche Creek -
Deroche Creek Realignment and Sediment Removal
Deroche -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Douglas First Nation - Douglas IR# 8 Lot# 30 and 31 Development
Douglas IR#8 (08013) -
Xa'xtsa (Douglas First Nation) Wastewater and Sludge Management
Douglas IR#8 (08013) -
Access Route and Drill Pad Construction at Inch Creek Hatchery
Inch Creek Hatchery -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Construction of two buildings on Sumas First Nation Land, Abbotsford
Sumas First Nation, Abbotsford -
Inch Creek Hatchery Modernization: Construction of Tub Module
Inch Creek Hatchery -
Mission Institution (Medium) - Hydro Service Connection
Mission Institution -
Parking Lot repave
301 3rd Street West, Revelstoke -
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities) -
Maintenance Dredging, Fraser River, Small Craft Harbours
Mission Harbour -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1