Morin Lake Wellbeing Centre
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Lac La Ronge Indian Band (LLRIB) is proposing to build a new wellbeing centre to support the community of Hall Lake, situated on Morin Lake IR #217. The project emphasizes flexible, multi‑purpose spaces and culturally responsive design to serve community needs. It is planned to function as a long‑term hub for wellbeing services while allowing for future growth and adaptation. The wellbeing centre will span two floors with a total area of 1,668 m², and will be able to accommodate up to 300 people. The main floor, will include a multipurpose space designed for events, assemblies, and community activities, along with a round cultural room for Elders' gatherings, a youth fitness room, service areas, and a teaching kitchen. The second floor will accommodate offices, soft rooms, a technical room, and a resource centre.
Construction of the wellbeing centre will require connection to existing infrastructure, including power, water and communication services. Additional infrastructure includes a closed garage and a separate meat preparation building. The project will also require the installation of new supporting infrastructure, including an on-site generator and propane tanks.
Site preparation will include surveying, clearing and grading of the designated land area, and preparation for servicing and foundations. Construction activities consist of building foundations, structural framing, mechanical and electrical system installation, interior finishes, and associated site works such as access, utilities, and landscaping.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination – Start of Public Comment Period | - | April 29, 2026 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Morin Lake IR #217 (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2026-04-29 -
Proponent
Lac La Ronge Indian Band -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90418
Nearby assessments
...within 200 kilometres-
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
La Ronge RCMP New Detachment
La Ronge -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Sucker River Mithwayawikamik Wellbeing Center
Sucker River 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
La Ronge Area Peat Harvesting Project
La Ronge -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
La Plonge Solar Project
English River First Nation Reserve -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Dore Lake Wharf Removal
Dore Lake -
Crean Channel Modification
Prince Albert National Park -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Outhouse relocation
Prince Albert National Park of Canada -
Montreal Lake RCMP New Detachment
Montreal Lake -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Blanket Permit - SaskPower - Wapachewunak First Nation (English River First Nation)
Wapachewunak First Nation No. 192D -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Road Resurfacing and Drainage Improvements
Kimosom Pwatinahk I.R. No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Little Red River Wellbeing Centre
Little Red River IR #106c -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Upgrade Single Tower & New Fibre Installation
Project site 5: Central East region - Pelican Narrows -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Pelican Narrows Subdivision Stage 7
Pelican Narrows I.R. No. 184B -
Flying Dust Commercial Project
Meadow Lake -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Walk Into History
Chitek Lake -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Pelican Narrows Lagoon Expansion
Pelican Narrows I.R. No. 184B -
Beaver dam and lodge removal
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville