SaskPower is proposing to salvage a pad mount transformer and abandon an underground cable in Prince Albert National Park. The equipment was used at a Boreal Ecological Research Monitoring Station which was discontinued in the winter of 2018. The infrastructure of the monitoring station is being removed in order to rehabilitate the site. Equipment that is expected to be used for the salvage project includes: a digger truck, back-hoe, and crew trucks. Access to the site and infrastructure will make use of existing roads and trails. Surface disturbance is expected to be minimized to the pad mount transformer salvage location.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | November 11, 2019 |
| 1 | New Project Being Assessed by Parks Canada - Public Comments Invited 6 September to 6 October, 2019 | - | September 6, 2019 |
Contacts
Prince Albert National ParkBox 100
Waskesiu Lake, Saskatchewan S0J 2Y0
Telephone: 306-663-4522 or 1-888-773-8883
Email: npfuimpactassessment@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Prince Albert National Park (Saskatchewan)
-
Nature of Activity
- Hydroelectric Energy
- Waste Management
-
Assessment Status
Completed -
Start Date
2019-09-06 -
Proponent
SaskPower -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80201
Nearby assessments
...within 200 kilometres-
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Little Red River Wellbeing Centre
Little Red River IR #106c -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Beaver dam and lodge removal
Prince Albert National Park -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Outhouse relocation
Prince Albert National Park of Canada -
Crean Channel Modification
Prince Albert National Park -
Montreal Lake RCMP New Detachment
Montreal Lake -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Walk Into History
Chitek Lake -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Dore Lake Wharf Removal
Dore Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
La Ronge Area Peat Harvesting Project
La Ronge -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Flying Dust Commercial Project
Meadow Lake -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Morin Lake Wellbeing Centre
Morin Lake IR #217 -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
La Ronge RCMP New Detachment
La Ronge -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Thunderchild Community Walking Trail
Thunderchild First Nation -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Thunderchild First Nation Firehall
Thunderchild First Nation Indian Reserve No. 115B -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Sucker River Mithwayawikamik Wellbeing Center
Sucker River 156C -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
La Plonge Solar Project
English River First Nation Reserve -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M