Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Mosquito Grizzly Bear's Head Lean Man First Nation is proposing the construction of the Core Area Subdivision project. The proposed project has two phases of development including 32 lots in Phase 1 and an additional 35 lots in Phase 2 within
Sec 33-040-16 W3M. The lot layout utilizes a standard 30 m lot frontage plan. There are 2 points of access planned to effectively distribute internal traffic and enable emergency access. Where possible, the internal road network is located outside low-lying areas to mitigate the potential for flooding. The lots have no back neighbors, cul-de-sacs provide extra spacing, and minimal trees will be removed during construction to create a barrier between each lot. It will include roadwork and site preparation, trench excavation and backfill, pressure pipe, gravity domestic sewer, building services and utilities.
Minimal construction waste will be generated, which will be deposited in the local landfill located on the reserve. No hazardous waste is expected to be generated by this project.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision | - | July 17, 2024 |
| 1 | Notice of Intent -Start of Public Comment Period | - | February 19, 2024 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Mosquito Grizzly Bear's Head Lean Man First Nation (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2024-02-19 -
Proponent
Mosquito Grizzly Bear's Head Lean Man First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87348
Nearby assessments
...within 200 kilometres-
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Sweetgrass New School
Sweetgrass IR 113 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Little Pine First Nation Health Clinic
Little Pine Indian Reserve No. 116 -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Kerrobert -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Apron III infill
Saskatoon International Airport YXE -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Thunderchild First Nation Firehall
Thunderchild First Nation Indian Reserve No. 115B -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild Community Walking Trail
Thunderchild First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Dakota Springs Spa
Whitecap IR #94 -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Walk Into History
Chitek Lake -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Beaver dam and lodge removal
Prince Albert National Park -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Onion Lake Family Services Inc. Child and Family Services Building
Onion Lake First Nation -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Lloydminster Region Abandonment Project
Makaoo Indian Reserve 120 (Onion Lake Cree Nation) -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Flying Dust Commercial Project
Meadow Lake -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
New Power Line Installation
CFB Suffield, Medicine Hat -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
Upgrades to Roads within Administrative Area- Garrison Wainwright
Garrison Wainwright -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Makwa Sahgaiehcan First Nation Well Completion
Makwa Sahgaiehcan First Nation -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Construct Hazardous Waste Storage Facility - Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Construct Building for Ammunition Salvage at Garrison Wainwright
Garrison Wainwright -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Remedial activities at a site impacted by Aqueous Film Forming Foam (AFFF) - Garrison Wainwright
Garrison Wainwright -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Makwa Sahgaiehcan First Nation Transfer Station
Makwa Sahgaiehcan First Nation -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Onion Lake 3D 2026 Seismic Program
Onion Lake 3D 2026 Seismic Program -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Transformer Salvage
Prince Albert National Park -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Battle River Pumphouse Replacement - Garrison Wainwright
Garrison Wainwright -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Little Red River Wellbeing Centre
Little Red River IR #106c -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Demolition of Building 598 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Upgrade of Main Refueling Station at Canadian Forces Base Wainwright (Alberta)
CFB Wainwright -
Demolition of Building 27 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Ministikwan Subdivision Development
Ministikwan IR 161 -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161