Front Gate Water Loop - Garrison Wainwright

The purpose of this project is to create a water loop to improve circulation and residual chlorine levels at the Front Gate Building (B735) and Denwood House (B200) at Garrison Wainwright. A new water line will be installed to connect the service lines at B735 and B200 to the east end of Avenue du Parc. Project activities will include:
· mobilization and demobilization of equipment and materials
· civil works including traffic control, utility locates, tree clearing and grubbing, surface restoration
· installation of new water line with horizontal directional drilling method
· line connections and modifications
· installation of recirculation pumping station
· electrical connections


Latest update

May 9, 2021 - The public comment period on the project is closed. The Department of National Defence is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Contacts

Department of National Defence
Roy Simpson, Project Manager, Real Property Operations Unit (West) Detachment Wainwright
Real Property Operations Unit (West) Detachment Wainwright
Denwood, Alberta T0B 1B0
Telephone: 780-842-1363 ext. 1308
Email: roy.simpson@forces.gc.ca


  • Location

    • Garrison Wainwright in Denwood (Alberta)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    In progress
  • Start Date

    2021-04-19
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    81547