Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The parking lot adjacent to the RCMP K Division building services multiple stalls for RCMP and the public. Current asphalt is showing signs of wear and in need of replacement. Work will include new parking stalls with new cast-in-place paved concrete and new traffic/stall/handicap identification lines. The current roadway/lot is comprised of an asphalt paved surface and the new project should be in accordance to standards to last and provide long life.
The project scope will include all lots based on drawings and onsite investigation, but will not include the pedestrian walkways. This work will also not include restoration or replacement of the median curbs while making every attempt to maintain the integrity of the electrical pedestals, trees and light standards in the medians.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Contacts
Dana GrindeanPublic Services and Procurement Canada
Dana Grindean, Environmental Officer
310 - 269 Main Street
Winnipeg, Manitoba
R3C 1B3
Winnipeg, Manitoba R2N 2N2
Telephone: 431-374-6412
Email: Dana.Grindean@pwgsc.gc.ca
-
Location
- Edmonton (Alberta)
-
Nature of Activity
- Building and Property Development
- Maintenance activities (fences, walls)
-
Assessment Status
In progress -
Start Date
2021-02-02 -
Proponent
Public Services and Procurement Canada -
Authorities
- Public Services and Procurement Canada
-
Assessment Type
Project on federal lands -
Reference Number
81348
Nearby assessments
...within 200 kilometres-
Trans Mountain Expansion Project
Edmonton -
Base Line Terminal Project
Edmonton -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Alexander First Nation Campground Project
Alexander First Nation -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Redwater Facility Rail Yard Project
Near Redwater -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Alexander Wastewater Treatment Plant
Alexander First Nation -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Culvert Replacement with Larger Diameter
Elk Island National Park -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Alexander First Nation: BF 77352 Replacement and Twp. Rd 562 Improvements
Alexander First Nation -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Astotin Lake Dock Replacement
Elk Island National Park -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Lamont Railcar Storage Project
Northwest of Lamont -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Xplornet Telecommunications Tower Project
Alberta Beach -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Sundance 7 Generating Station Project
Wabamun -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Waheeba Solar Energy Project
Alexis First Nation -
Genesee Generating Station Expansion Project
Near Warburg -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Ryley Biomedical Waste Incinerator Project
Ryley -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Ryley Facility Expansion Project
Ryley -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
Sunchild Gas Distribution Line
Sunchild -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Moraine Power Generation Project
Whitecourt -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Drayton Valley -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
TransCanada Energy East Pipeline Project
Hardisty -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Clearwater Peat Harvesting Project
Caroline -
Enbridge Line 3 Replacement Program
Hardisty -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Edson Mainline Expansion Project
Rocky Mountain House -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood)