Paul First Nation Solar Energy Project Interconnection Line

AltaLink proposes to construct a 69 kilovolt (KV) interconnection line of approximately 160 m length between the 37 megawatt (MW) photovoltaic solar energy project (Paul Band Solar Project) on Lot 2 of the Wabamun I.R. 133A land south of Wabamun, AB, and the existing 69 kV transmission line (234L) that borders Lot 2 (the Project).The Project will consist of erecting poles, stringing 3 phase conductors, and connecting to the Paul Solar Project substation and the existing AltaLink 234L 69kV transmission line.


Latest update

March 20, 2026 - Indigenous Services Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
2 Notice of Determination - March 20, 2026
1 Notice of Intent to Make a Determination – Start of Public Comment Period - January 5, 2026

Contacts

Environmental Review Process Alberta Region
Indigenous Services Canada
Environmental Review Process Alberta Region
630 Canada Place, 9700 Jasper Avenue
Edmonton, Alberta T5J 4G2
Email: paeab-erpab@sac-isc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Paul First Nation (Alberta)
  • Nature of Activity

    • Alternative Energy
  • Assessment Status

    Completed
  • Start Date

    2026-01-05
  • Proponent

    AltaLink
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number