Big Horn Reserve Water System
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Stoney Tribal Administration plans to upgrade the water treatment and distribution infrastructure on Big Horn Reserve No. 144A. Proposed works include the extension of 10 km of the existing distribution pipes, the construction of a new Water Treatment Plant, the upgrade of each existing well's long-term yield and peak withdrawal capacity, an upgrade of the existing filtration process, an upgrade of the existing reservoir to 900 m3, a new 100m3 Storage reservoir, 2 Pressure Reducing/Sustaining Stations and upgrades to the existing school reservoir. Proposed project activities include clearing vegetation, removal of topsoil, grubbing, and re-grading. The proposed construction method is to use an isolated open-cut for the distribution pipe's water and wetland crossings.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
March 31, 2023 - The public period on the project is closed. Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Comment Period on Intent to Make a Determination | - | October 3, 2022 |
Contacts
Indigenous Services CanadaCassandra Breton, Environment Officer
630 Canada Place 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 587-338-7033
Email: cassandra.breton@sac-isc.gc.ca
-
Location
- Big Horn Reserve No. 144A (Alberta)
-
Nature of Activity
- Water Management
-
Assessment Status
In progress -
Start Date
2023-02-28 -
Proponent
Stoney Tribal Administration -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84014
Nearby assessments
...within 200 kilometres-
Big Horn Fire Hall
Big Horn Reserve -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild Gas Distribution Line
Sunchild -
Edson Mainline Expansion Project
Drayton Valley -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Ya Ha Tinda Ranch Solar Array
Banff National Park -
Robb Trend Coal Mine Expansion Project
Robb -
Margaret Creek Fish Barrier Creation
Banff National Park -
PCA Clearwater Prescribe Burn
Banff National Park of Canada -
Edson Mainline Expansion Project
Rocky Mountain House -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Clearwater Peat Harvesting Project
Caroline -
Fortis Line Rebuild at Lake Louise Ski Area
Banff National Park -
Ross Lake Fire Guard
Yoho National Park of Canada -
Lake Louise Community Fire Guard
Banff National Park -
Lake Louise Heliport
Kootenay/Yoho/Lake Louise National Parks -
Lake Louise Inn Generator and Exit Stairs
Banff National Park -
Village of Lake Louise Utilities Selected System Upgrades
Banff National Park -
Mountaineer Lodge Staff Accommodation - 221 Hector Road
Banff National Park -
Fairmont Chateau Lake Louise Cooling Unit Installation
Banff National Park -
Chateau Lake Louise New Parking Lot Construction
Banff National Park of Canada -
Fairmont Chateau Lake Louise Pool Demolition
Banff National Park -
Deer Lodge Redevelopment
Banff National Park -
Chateau Lake Louise Pool Rebuild
Banff National Park -
Badger Lake Non-Native Trout Removal
Banff National Park -
Abbot Pass Hut National Historic Site Removal
Yoko National Park, Detailed Impact Assessment -
Small-scale habitat enhancement for bears near Lake Louise, Alberta
Banff National Park -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
Fortis Line Install at CP Mile 108
Banff National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Moraine Lake Lodge Duplex Cabins
Banff National Park -
Protection Mountain Fire Guard
Banff National Park -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Mannix Pit 10 Year Gravel Extraction and Reclamation Expansion
Banff National Park of Canada -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Jacques Lake Realignment
Jasper National Park of Canada -
Moraine Lake Lodge Staff Accommodation
Banff National Park -
Trail 8c Realignment
Jasper National Park of Canada -
Fortis Alberta 610013030 Castle Junction 551L Rebuild
Banff National Park of Canada -
PCA Castle Mountain Campground Utilities Upgrade
Banff National Park -
Town of Banff Affordable Housing Apartments, 338-342 Banff Avenue
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Parks Canada HWY 93S Boom Creek Culvert Replacement
Banff National Park -
Yoho Administration Building Parking Lot Expansion
Yoho National Park -
Kootenay National Park (KNP) Avalanche Mitigations, Whymper Remote Avalanche Control Systems (RACS)
Kootenay National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Johnston Canyon Railing Extension
Banff National Park -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
Highway 947 Extension Project
Edson -
Pine Bungalows Master Plan 2021
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Highway 93S km 20 Bank Stabilization
Kootenay National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
PCA Forty Mile Prescribe Fire
Banff National Park -
Cascade Pit Gravel Crushing
Banff National Park -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Banff Air Strip Structure Removal
Banff National Park -
Town of Banff 36 Unit Apartment, 418-420 Cougar Street
Banff National Park of Canada -
Town of Banff Water Withdrawal, Distribution and Treatment System
Banff National Park -
ATCO Gas Installation of 5 Cathode Test Stations in the Town of Banff
Banff National Park -
100 Falcon Street-New carpentry shop
Banff National Park -
Eagle Crescent Mountain View BBQ Housing
Banff National Park -
Fairholme II Prescribed Fire
Banff National Park -
FortisAlberta Sunshine Cable Replacement - Phase 2
Banff National Park -
FortisAlberta Cascade 177S Substation Maintenance
Banff National Park -
Town of Banff 435 Squirrel Street Shaw Cable
Banff National Park -
AltaLink 54L Transmission Rebuild
Banff National Park -
435 Squirrel Street CP Rail Transformer Installation
Banff National Park -
Shaw Cable Installation at 327 Railway Ave
Banff National Park -
Telus Roehampton CP Rail Yard Mobility
Banff National Park -
Addition of three residential units to the existing apartment housing
Banff National Park of Canada -
Tunnel Mountain Campground Winter Use
Banff National Park -
Otter Hotel Development (Inns of Banff)
Banff National Park of Canada -
Town of Banff 311 and 317 Squirrel Street Redevelopment
Banff National Park -
Banff Lodging Company-413 Beaver Street Redevelopment
Banff National Park -
Town of Banff 425 Muskrat St New 8 Unit Residential Dwelling
Banff National Park -
Banff Community High School Sidewalk Expansion
Banff National Park of Canada -
Town of Banff Bow River Bridge Old Pump Station Building Demolition
Banff National Park -
Town of Banff Atco gas valve replacements, Wolf Street
Banff National Park -
Developing a backyard cabin into Bed and Breakfast
Banff National Park of Canada -
Town of Banff Bear Street Reconstruction
Banff National Park -
Town of Banff 347 Grizzly Street New Garage and Accessory Dwelling
Banff National Park -
Town of Banff 135 Lynx Street New Accessory Dwelling
Banff National Park -
Bow Valley Credit Union- New Mixed Use Building Construction, 212 Banff Ave. Town of Banff
Banff National Park -
Shaw Cable Conduit Installation in Town of Banff
Banff National Park of Canada -
19DP86 - 220 Otter Street Demo and New Building
Banff National Park -
206 Otter Street Single Detached Dwelling Residential Addition
Banff National Park -
Fortis Transformer Replacement
Banff National Park -
Town of Banff, New Family home construction, 129 Kootenay Ave
Banff National Park -
Town of Banff Atco gas valve replacement
Banff National Park -
Town of Banff Recreation Grounds Redevelopment and New Pedestrian Bridge
Banff National Park -
514 Buffalo Street, Crandell Peck Cabin Addition, Studio North
Banff National Park of Canada -
Town of Banff Jasper Way to Cave Ave Commuter Trail
Banff National Park -
Town of Banff Bow River Bridge 2023 Rehabilitation Works
Banff National Park of Canada -
Banff Trail Riders-3 Mile BBQ Redevelopment
Banff National Park -
Town of Banff Bow River Sewer Siphon Liner Installation and In-Water Riffle Construction
Banff National Park -
115 Spray Avenue Garage with Suite
Banff National Park -
Town of Banff - Construction of Single Detached Home with Accessory Dwelling, 119 Spray Avenue
Banff National Park -
PCA Backcountry Shelter Redevelopment-Bryant and Egypt
Banff National Park -
Sunshine Village Ski Area - Parking Lot Reconfiguration and Improvements
Banff National Park -
Sunshine Village Ski Resort Bourgeau Parking Lot Parkade
Banff National Park -
Pursuit Night Rise Program
Banff National Park of Canada -
Sunshine Village Ski Resort Ski Out Widening Tree Removals
Banff National Park of Canada -
Sunshine Village Ski Resort Long Range Plan
Detailed Impact Assessment, Banff National Park -
Hazard Spruce Tree Removal
Glacier National Park -
Sunshine Village Ski Resort Angel Chairlift Replacement
Banff National Park of Canada -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Morley, AB -
Simpson 3 Avalanche Path Berm, Kootenay National Park
Kootenay National Park -
Parks Canada Meadow Restoration Prescribe Fire Plan
Banff National Park -
Parks Canada National Fire Cache Facility Construction
Banff National Park of Canada -
Canalta 530 Banff Ave Redevelopment
Banff National Park -
FortisAlberta Pole Replacement - Town of Banff (610013803)
Banff National Park -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
ATCO Gas Cascade Mall Banff
Banff National Park -
ToB 22DP57 216-218 Muskrat Street Redevelopment
Banff National Park of Canada -
Town of Banff 222 Otter Street Redevelopment
Banff National Park -
Town of Banff 217 Otter Street Redevelopment
Banff National Park of Canada -
Town of Banff 220 Otter Street-Duplex with Accessory Dwelling
Banff National Park of Canada -
Private owner build, new duplex within the Town of Banff
Banff National Park -
Town of Banff 525 Buffalo Street Development
Banff National Park -
Stoney Morley Broadband Tower Installation (Tower 12)
Stoney Nakoda Nation -
Genesee Generating Station Expansion Project
Near Warburg -
Simpson River Pit Toilet Installation
Kootenay National Park of Canada -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve, Morley, AB 6318 Forestry Trunk Road
Morley, AB 6318 Forestry Trunk Road -
Stoney Morley Rapid Housing Project
Morley -
Stoney Phase 17 Housing Project
Wesley First Nation -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Ozada, AB -
Stoney Nakoda Nation Broadband Tower installation - Tower 14 Project
Stoney Nakoda Nation -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Seebe, AB -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley, Eagle Hill Rd -
Stoney Phase 18 Housing Project
Wesley First Nation -
Wesley First Nation Solar Panels Project
Morley and Bighorn -
Stoney North Morley Sanitary Servicing
Stoney First Nation -
Chiniki First Nation - Rapid Housing 3
Chiniki First Nation -
Wesley Band Goodstoney Meadows Development
Morley, AB -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, 133X -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, 133X -
Kootenay Crossing Horse Facility Building Decommissioning and Site Rehabilitation
Kootenay/Yoho/Lake Louise National Parks of Canada -
Kootenay Crossing Warden Station Decommissioning
Kootenay National Park -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
Sundance 7 Generating Station Project
Wabamun -
Stoney Phase 18 Housing Project
Chiniki First Nation -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, Stoney 142 -
PCA Backcountry Shelter Redevelopment-Bryant and Egypt
Banff National Park -
Stoney Nakoda Broadband Tower installation - Repeater Towers
Stoney Nakoda Nation -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Cochrane, AB -
Crooks Meadows Stream Dredging
Kootenay National Park -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
JCLS Church Shaw Cable installation
Banff National Park -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Ruddock Creek Mine Project
Avola -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Xplornet Telecommunications Tower Project
Alberta Beach -
Alexander First Nation Campground Project
Alexander First Nation -
Sanitary sewer servicing for Bigham Crossing
Springbank Airport -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Radium Hot Springs Aquacourt Foundation Stabilization, Phase 2
Kootenay National Park -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Springbank Off-Stream Reservoir Project
15 kilometres west of Calgary -
Waheeba Solar Energy Project
Alexis First Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Redstreak Lagoon Decommission and Reclamation, Phase II, Kootenay National Park
Kootenay National Park -
Highway 947 Extension Project
-
Rooftop Solar Installation at Letter Carrier Depot (LCD) NW Calgary
40 Royal Vista Drive NW, Calgary, Alberta -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Tsuut'ina Nation Fire Smart Project
Tsuut'ina Nation