Parks Canada Agency Douglas Fir Slopes Prescribed Burn
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
This project will be assessed with a basic impact assessment. Jasper National Park Fire Operations is proposing to burn Douglas Fir Hillsides units surrounding the Jasper townsite. There are nine, low complexity units that range from 16 to 83 ha, for a total of 382 ha. Desired fire behaviour will be low intensity surface fire resulting in significant understory woody regeneration mortality, significant reduction of surface fuels and minimal canopy tree mortality. The primary objective of this prescribed fire is to support restoration and maintenance of Douglas-fir savannah ecosystems. Secondary objectives include education opportunities for the public regarding the role of fire in forest ecosystem and wildfire risk reduction. Prior to unit ignition, hand felling of understory fir and pine regeneration may be required in order to minimize the risk of crown fire in units with dense understory regeneration. Control lines will be burned prior to main unit ignition and in some cases may be reinforced with wetline.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | March 15, 2022 |
1 | New project being assessed by Parks Canada - Public comments invited from September 22 to October 22, 2021 | - | September 22, 2021 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2021-09-22 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
83029
Nearby assessments
...within 200 kilometres-
Trail 1a Jasper National Park
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Trail 8c Realignment
Jasper National Park of Canada -
Jacques Lake Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Robb Trend Coal Mine Expansion Project
Robb -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Big Horn Fire Hall
Big Horn Reserve -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Summit Mine 14 Project
Grande Cache -
Edson Mainline Expansion Project
Drayton Valley -
Ruddock Creek Mine Project
Avola -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Highway 947 Extension Project
-
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Hazard Spruce Tree Removal
Glacier National Park -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Sunchild Gas Distribution Line
Sunchild -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese First Nation
O'Chiese First Nation -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Margaret Creek Fish Barrier Creation
Banff National Park -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Harper Creek Mine Project
Vavenby -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Emerald Canoes Dock Replacement
Yoho National Park of Canada -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Wildfire Risk Reduction Maintenance Activities - Yoho, Kootenay, and Banff National Parks (2023-2034)
Yoho National Park of Canada -
Mt. Stephen Trail Reroute
Yoho National Park of Canada -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park -
Ross Lake Fire Guard
Yoho National Park of Canada