ATCO Miette 5L215 Rebuild
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
ATCO is proposing to replace a 7.6 km section of overhead distribution line in Jasper National Park. The line currently extends from the Fiddle River Ashlar Ridge Lookout to Miette Hot Springs, and will be replaced with an equivalent length of mostly underground distribution line buried 1.2 m deep within the shoulder of the Miette Road. Short overhead segments will be installed where topographical constraints and the road alignment prevent underground installation. The existing line has significant access constraints from rough terrain, the proximity of Sulphur Creek and Fiddle River. Dense vegetation results in frequent and significant outages. Access limitations extend outage duration. Moving the line is anticipated to result in ecological gains and improve line reliability, safety and aesthetics. The project will be assessed with a basic impact assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New Project Being Assessed by Parks Canada - Public Comments Invited 07 november to 07 december, 2019 | - | November 7, 2019 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2019-11-07 -
Proponent
ATCO -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80299
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Trail 8c Realignment
Jasper National Park of Canada -
Jacques Lake Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Biocontrol of Linaria dalmatica (Dalmatian Toadflax) using the agent Mecinus janthiniformis (Stem-boring weevil) in Jasper National Park
Jasper National Park of Canada -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Jasper House Bungalows Master Plan
Jasper National Park -
Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project
10 kilometres east of Hinton -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Trans Mountain Pipeline Site KP387 Bioremediation
Jasper National Park of Canada -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Trans Mountain Derr Creek Bridge Replacement
Jasper National Park of Canada -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Robb Trend Coal Mine Expansion Project
Robb -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Pursuit - Columbia Icefield Adventure Tour Road Maintenance Program
Jasper National Park of Canada -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Summit Mine 14 Project
Grande Cache -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
Stoney Big Horn Fire Hall
Big Horn Reserve -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Highway 947 Extension Project
-
Edson Mainline Expansion Project
Drayton Valley -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Sunchild Gas Distribution Line
Sunchild -
Ruddock Creek Mine Project
Avola -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Moraine Power Generation Project
Whitecourt -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Margaret Creek Fish Barrier Creation
Banff National Park -
Prairie Lights Power Project
Greenview