Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project
Coalspur Mines (Operations) Ltd. is proposing to expand the existing Vista Coal Mine Phase I (Phase I), a surface coal mine located approximately 10 kilometres east of Hinton, Alberta. The operation would extract and export thermal coal to international markets. The proposal includes two expansions: an underground coal mine (Vista Coal Underground Mine) and a westward expansion of the Phase I mine pits (Vista Mine Phase II Expansion). The expansions would use existing Phase I mine infrastructure, such as coal processing facilities, raw and clean coal conveyors, primary access corridor, and a coal load-out facility.
These expansions were previously referred to as the Phase I Vista Test Underground Mine and Vista Mine Phase II Expansion Projects.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
94 | New Order Designating Physical Activities | - | September 29, 2021 |
93 | New Minister's Response | - | July 29, 2021 |
Contacts
Vista Coal Underground Mine Project and Vista Mine Phase II Expansion ProjectImpact Assessment Agency of Canada
1145-9700 Jasper Avenue
Edmonton, Alberta T5J 4C3
Telephone: 780-495-2037
Email: vistamine-minevista@iaac-aeic.gc.ca
-
Location
- 10 kilometres east of Hinton (Alberta)
-
Nature of Activity
- Mines and Minerals
-
Assessment Status
In progress -
Start Date
2021-05-06 -
Proponent
Coalspur Mines (Operations) Ltd. -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Designated project - Awaiting initial project description -
Reference Number
80731
Nearby assessments
...within 200 kilometres-
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Robb Trend Coal Mine Expansion Project
Robb -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Trail 8c Realignment
Jasper National Park of Canada -
Jacques Lake Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Highway 947 Extension Project
-
Edson Mainline Expansion Project
Drayton Valley -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Summit Mine 14 Project
Grande Cache -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Edson Mainline Expansion Project
Drayton Valley -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Big Horn Fire Hall
Big Horn Reserve -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Moraine Power Generation Project
Whitecourt -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Sunchild Gas Distribution Line
Sunchild -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 6 -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 4 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 3 -
Prairie Lights Power Project
Greenview -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 5 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 1 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 2 -
Sundance 7 Generating Station Project
Wabamun -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Waheeba Solar Energy Project
Alexis First Nation -
Upgrade (multiple) towers
Sturgeon Lake No.154A (Sturgeon Lake Cree Nation) - Site 7 -
Paul First Nation Gas Station Project
Paul First Nation -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Paul First Nation 2-unit Housing Project
Paul First Nation -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada