Summit Mine 14 Project

Summit Coal Inc. is proposing the construction, operation, decommissioning and abandonment of an underground metallurgical coal mine located approximately four kilometres northeast of Grande Cache, Alberta. As proposed, the Summit Mine 14 Project would have a coal production capacity of approximately 3,562 tonnes per day. The project would have a surface footprint of 53.5 hectares and a subsurface area of approximately 512 hectares.


Latest update

November 14, 2022 — The Minister of Environment and Climate Change has determined that the Summit Mine 14 project proposed by Summit Coal Inc. does not warrant designation under the Impact Assessment Act. The reasons for the Minister’s determination are provided in the Minister’s response.

Participate

Key documents

Key documents
Document Number Document Title File Date
3 Minister's Response - November 14, 2022
1 Request for designation of project PDF (4.5 MB) August 15, 2022

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca


  • Location

    • Grande Cache (Alberta)
  • Nature of Activity

    • Mines and Minerals
  • Assessment Status

    Completed
  • Proponent

    Summit Coal Inc.
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Assessment not applicable
  • Reference Number

    83917