ATCO Gas Installation of 5 Cathode Test Stations in the Town of Banff

ATCO is planning to install 5 test stations to improve monitoring of the cathodic protection systems on existing steel gas utility lines in the Town of Banff. Hydrovac trenching of existing lines and small excavation at each test station site is required. Test stations to be installed at the following intersections: Owl St. and Hawk Ave., Lynx St. and Railway Ave., Wolf St. and Marten St., Nahanni Dr. and Mountain Ave. and Spray Ave. and Rundle Ave.


Latest update

January 20, 2020 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

Banff National Park
Box 900
Banff, Alberta T1L 1K2
Telephone: 403-762-1419
Email: anna.brown@pc.gc.ca


  • Location

    • Banff National Park (Alberta)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2019-11-18
  • Proponent

    ATCO Gas
  • Authorities

    • Parks Canada Agency
  • Assessment Type

    Project on federal lands
  • Reference Number

    80318