Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
August 24, 2023 – Edmonton Regional Airports Authority must decide whether the proposed rehabilitation and construction work to existing parking lots, parkade and roadways at Edmonton International Airport (YEG) is likely to cause significant adverse environmental effects.
To help inform this decision, Edmonton Regional Airports Authority is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public [and may be posted online]. For more information, individuals should consult the Privacy Notice on the Registry website.
Written comments must be submitted by September 23, 2023 to:
Edmonton Regional Airport Authority
1, 1000 Airport Road, Edmonton International Airport, AB, T9E OV3
yegimpactassessments@flyeia.com
The Proposed Project
The locations of the project will take place at Edmonton International Airport's Departures area, Arrivals vicinity, the existing parkade and parking lots, in the terminal building and on Airport Road. The scope includes, but is not limited to, design services, construction drawings and construction administration services. Furthermore, and as required, earthworks, concrete removal, repaving, building temporary accesses as well as modernizing, modifying or upgrading existing infrastructure, utility assets and related miscellaneous items (lighting, signage, surveillance equipment, line painting) are all part of the planned work.
The Edmonton Regional Airports Authority is performing the scope of the project to alleviate damage to existing infrastructure, improve safe operations for the general public as well as upgrade and replace existing assets that are at the end of their life cycle.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
October 04, 2023 – Edmonton Regional Airport Authority has determined that the proposed Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways project is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- impacts on rights of Indigenous peoples;
- Indigenous knowledge;
- community knowledge;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Edmonton Regional Airports Authority is satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects. Therefore, Edmonton Regional Airports Authority may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part..
Participate
Contacts
Utilities and Environment / Edmonton Regional Airports AuthorityRoger Steele, Manager of Utilities and Environment
1, 1000 Airport Road, Edmonton International Airport
Edmonton, Alberta T9E 0V3
Email: yegimpactassessments@flyeia.com
-
Location
- Edmonton International Airport (Alberta)
-
Nature of Activity
- Airport and Airfields
-
Assessment Status
Completed -
Start Date
2023-08-24 -
Proponent
Edmonton International Airport -
Authorities
- Edmonton Regional Airport Authority
-
Assessment Type
Project on federal lands -
Reference Number
85864
Nearby assessments
...within 200 kilometres-
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Trans Mountain Expansion Project
Edmonton -
Base Line Terminal Project
Edmonton -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Alexander First Nation Campground Project
Alexander First Nation -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Genesee Generating Station Expansion Project
Near Warburg -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Paul First Nation 2-unit Housing Project
Paul First Nation -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Alexander Wastewater Treatment Plant
Alexander First Nation -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Redwater Facility Rail Yard Project
Near Redwater -
Sundance 7 Generating Station Project
Wabamun -
Alexander First Nation: BF 77352 Replacement and Twp. Rd 562 Improvements
Alexander First Nation -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Astotin Lake Dock Replacement
Elk Island National Park -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Xplornet Telecommunications Tower Project
Alberta Beach -
Enbridge Northern Gateway Project
Bruderheim -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Lamont Railcar Storage Project
Northwest of Lamont -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Ryley Biomedical Waste Incinerator Project
Ryley -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Waheeba Solar Energy Project
Alexis First Nation -
Ryley Facility Expansion Project
Ryley -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
Sunchild Gas Distribution Line
Sunchild -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Parking lot replacement at RCMP Detachment in Innisfail, Alberta
Innisfail -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Clearwater Peat Harvesting Project
Caroline -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Rocky Mountain House -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
TransCanada Energy East Pipeline Project
Hardisty -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Enbridge Line 3 Replacement Program
Hardisty -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Moraine Power Generation Project
Whitecourt -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright