Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright

The purpose of the project is to increase the electrical capacity and to provide emergency back-up power for Building 650.

Project activities include:

  • Replace the existing pad-mounted transformer; and
  • Upgrade the electrical services installation (inside and outside building).

Upgrading includes:
o Demolishing and capping off existing duct bank and installing a new duct bank
o Installing UPS (300kVA at 20'x8')
o Installing Generator (750kW at 30'x10')

The Generator will include a fuel tank of size to suffice for 8-hours of continuous operation at full load

More


Latest update

Notice of Determination
August 11, 2020— The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Project Manager, Real Property Operations Unit (West) Detachment Wainwright
Department of National Defence
Caroline Paquin, Project Manager, Real Property Operations Unit (West) Detachment Wainwright
Real Property Operations Unit (West) Detachment Wainwright
Denwood, Alberta T0B 1B0
Telephone: 780-842-1363 ext. 1361
Email: caroline.paquin@forces.gc.ca


  • Location

    • Garrison Wainwright (Denwood) (Alberta)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Completed
  • Start Date

    2020-06-10
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    80766