Frog Lake Waskonaman Hill Gravel Project (Amendment)

Waskonaman Askih Construction GP LTD. is proposing to amend the original project submission for the gravel pit to include additional areas. Aggregate was identified over a 15 ha area, the proponnt is proposing to amend their 3 ha pit to a 15 ha pit, including a 1.5 ha laydown area. The proposed project would consist of 5 Phases (3 ha in size). Each phase will extract approximately 100,000 m3 of aggregate, for a total of ~500,000 m3. Based on Alberta Transportation criteria (1 m3 = 1.632 tonnes), the project will mine ~816,000 tonnes of aggregate throughout the life of the project. Previous project details (i.e., laydown area, equipment used) remain the same. Each phase will be mined for an approximate 2-year period, and progressively reclaimed. In total, the project is anticipated to be mined and reclaimed within a 10-15 year time frame. 


Latest update

May 29, 2020 – Indigenous Services Canada issued its notice of determination https://iaac-aeic.gc.ca/050/evaluations/document/134164 and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Contacts

Indigenous Services Canada
Stacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca


  • Location

    • Frog Lake First Nation (Alberta)
  • Nature of Activity

    • Mines and Minerals
  • Assessment Status

    Completed
  • Start Date

    2019-12-18
  • Proponent

    Waskonaman Askih Construction
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands