Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Cold Lake First Nation proposes construction and/or renovation for 10 housing units.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
October 2, 2019 – Indigenous Services Canada issued its notice of determination https://iaac-aeic.gc.ca/050/evaluations/document/132751 and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Cold Lake First Nation Housing Project 2019 (10 Unit Renovation) | - | October 2, 2019 |
1 | Public Comment Period on Intent to Make a Determination | - | September 4, 2019 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Cold Lake First Nation (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2019-08-28 -
Proponent
Cold Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80193
Nearby assessments
...within 200 kilometres-
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Department of National Defence Future Fighter Capability Project - Demolition of Hangar 6 and Construction of New Fighter Squadron Facility
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Ramp Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WATERHEN I.R. 130 -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Powwow Arbour Construction
Pierceland -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Ministikwan Subdivision Development
Ministikwan IR 161 -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 3) -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161A -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 1) -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 2) -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
EAGLES LAKE I.R. 165C -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 1) -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 2) -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 3) -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Lamont Railcar Storage Project
Northwest of Lamont -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Ryley Facility Expansion Project
Ryley -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Astotin Lake Dock Replacement
Elk Island National Park -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Ryley Biomedical Waste Incinerator Project
Ryley -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Dore Lake Wharf Removal
Dore Lake -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Redwater Facility Rail Yard Project
Near Redwater -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
LA PLONGE I.R. 192 -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
TransCanada Energy East Pipeline Project
Hardisty -
Hardisty Rail Terminal Project
10 km southeast of Hardisty