Thunderchild First Nation Water Treatment Plant and Well Upgrades

Thunderchild First Nation is proposing to upgrade and revitalize their existing water treatment plant and related infrastructure. The proposed project includes addition of a new membrane treatment system and related infrastructure within the existing water treatment plant building, upgrade of an existing well, completion of a new, previously drilled well, and construction of approximately 150 meters of new access road to connect an existing road to the new well site. Decommissioning of a second existing well will also be included. The project is intended to extend the service life of the facility and meet the raw water supply service requirements of the growing population.

Project activities will include topsoil and overburden removal at the well sites and access road alignment, excavation at both well sites to install pitless adapters, minor excavation for construction of the access road, and placement of gravels at the road and well sites. Fencing will be installed at the well sites, and a membrane unit and mechanical and electrical equipment will be installed inside the existing water treatment plant building. Well decommissioning will follow provincial standards for drilled wells.

All anticipated waste generation from construction activities will be responsibly handled and disposed of at designated off-reserve facilities. Procedures will be followed to limit the amounts of waste generated during construction, and to mitigate any potential contamination pathways from the use of petroleum products on site.

More


Latest update

August 23, 2024 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments until September 22, 2024 respecting that determination.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Notice of Intent to Make a Determination - Start of Public Comment Period - August 23, 2024

Contacts

ISC-SKENV
Indigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca


  • Location

    • THUNDERCHILD FIRST NATION 115B (Saskatchewan)
  • Nature of Activity

    • Water Management
  • Assessment Status

    In progress
  • Start Date

    2024-08-23
  • Proponent

    Thunderchild First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    88849
Disclaimer