Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
CORCAN is building RTM (ready to move) houses for the local community. The RTM's will be built on site and then moved to the local community when the housing construction is completed.
Latest update
April 30, 2021 – The Correctional Service Canada issued its Notice of Determination and determined that the project Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings is not likely to cause significant adverse environmental effects.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | April 30, 2021 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | March 23, 2021 |
Contacts
Environmental Protection and Sustainable Development340 Laurier Ave W
Ottawa, Ontario K1A 0P9
Email: NHQ.Impact.Assessment.Act-Loi.sur.lEvaluation.dImpact.AC@csc-scc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Willow Cree Healing Lodge (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2021-03-23 -
Proponent
Correctional Service of Canada -
Authorities
- Correctional Service Canada
-
Assessment Type
Project on federal lands -
Reference Number
81469
Nearby assessments
...within 200 kilometres-
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Beaver dam and lodge removal
Prince Albert National Park -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Little Red River Wellbeing Centre
Little Red River IR #106c -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Muskoday Convenience Store Remediation
Muskoday First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Big River First Nation Arena Build Project
Big River IR 118 -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Aspen Power Station Project
Lanigan -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Montreal Lake RCMP New Detachment
Montreal Lake -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Outhouse relocation
Prince Albert National Park of Canada -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Crean Channel Modification
Prince Albert National Park -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Walk Into History
Chitek Lake -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass New School
Sweetgrass IR 113 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
Little Pine First Nation Health Clinic
Little Pine Indian Reserve No. 116 -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker -
Thunderchild Community Walking Trail
Thunderchild First Nation -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation Firehall
Thunderchild First Nation Indian Reserve No. 115B -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
Flying Dust Commercial Project
Meadow Lake -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88