Removal of existing 300 mm diameter culverts and ditches and replacement with surface drainage using concrete swales and curbing to improve safety and reduce flooding within subdivision on Whitecap Dakota First Nation. Work to be completed in SE 1/4 of Section 1 - Twp 34 - Range - 6 - W3M. Backfilling of ditches with granular material and miscellaneous site grading to facilitate runoff and drainage away from houses. New concrete curing and swales, new culverts and relocation of a 75 mm diameter natural gas main. Lifespan to be approximately 50+ years. No waste is anticipated outside of disposal of existing steel culverts.


Latest update

September 26, 2022 - Indigenous Services Canada issued its notice of determination Notice of Determination for Buffalo Berry Culvert Work - Canada.ca (iaac-aeic.gc.ca) and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination for Buffalo Berry Culvert Work - September 26, 2022
1 Public Comment Period on Intent to Make a Determination - August 22, 2022

Contacts

ISC-SKENV
Indigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca


  • Location

    • Whitecap IR #94 (Saskatchewan)
  • Nature of Activity

    • Water Management
    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2022-10-01
  • Proponent

    Whitecap Dakota First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83915