Parcel E Sublease - Eagle Ridge Residential Building
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The project proposed to development a new apartment building and parkade on the southeast corner of the Parcel E property within Prince Albert. The development entails a five story, 943 m2 building that will have 54 individual units and associated under and above ground parking and landscaping.
Latest update
April 22, 2026 - Indigenous Services Canada issued its notice of determination Notice of Determination for the Parcel E - Eagle Ridge Residential Building and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Parcel E - Eagle Ridge Residential Building | - | April 9, 2026 |
| 1 | Notice of Intent -Start of Public Comment Period | - | March 10, 2026 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Parcel E of Chief Joseph Custer Reserve (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2026-03-10 -
Proponent
Peter Ballantyne Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90286
Nearby assessments
...within 200 kilometres-
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Little Red River Wellbeing Centre
Little Red River IR #106c -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Beaver dam and lodge removal
Prince Albert National Park -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Batoche Drainage Improvement
Grasslands National Park -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Montreal Lake RCMP New Detachment
Montreal Lake -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Crean Channel Modification
Prince Albert National Park -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Outhouse relocation
Prince Albert National Park of Canada -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Apron III infill
Saskatoon International Airport YXE -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Walk Into History
Chitek Lake -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Aspen Power Station Project
Lanigan -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
La Ronge Area Peat Harvesting Project
La Ronge -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Flying Dust Commercial Project
Meadow Lake -
Dore Lake Wharf Removal
Dore Lake -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1)