James Smith Cree Nation is proposing to construct a new subdivision on the available land east of the existing core area within Sec 4-48-20-W2M. The scope of work would include new sewer mains, water mains, hydrants, service connections, natural gas, primary power, street lights, roadway construction, culverts and approaches, erosion control and lot preparation.
Site preparation activities require topsoil stripping and stockpiling. Construction activities include:
1. Deep underground utilities (water and sewer mains) will be installed.
2A. Sewage pumping station construction.
2B. Water and sewer services installed to each lot.
3. Rough grading of road right of way, ditches and lot grading.
4. Shallow utilities (power, gas & telephone) will be installed.
5. Roadway construction, topsoil replacement and landscaping.
6. Street light and signage installation.
No decommissioning of existing infrastructure is required.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the James Smith Cree Nation Subdivision Stage 4 | - | April 15, 2024 |
1 | Notice of Intent -Start of Public Comment Period | - | March 12, 2024 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- James Smith Cree Nation (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2024-03-12 -
Proponent
James Smith Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87410
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
SaskPower Transformer Salvage
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Beaver dam and lodge removal
Prince Albert National Park -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Crean Channel Modification
Prince Albert National Park -
Aspen Power Station Project
Lanigan -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Outhouse relocation
Prince Albert National Park of Canada -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Regional Psychiatric Centre
Regional Psychiatric Centre -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
La Ronge Area Peat Harvesting Project
La Ronge -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Dakota Springs Spa
Whitecap IR #94 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207