Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Replacement of 3 culverts along the main access road to allow for road upgrade and installation of underground telecommunication/underground high voltage lines.
Latest update
November 9, 2022— The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | November 9, 2022 |
1 | Public Comment Period on Intent to Make a Determination | - | September 21, 2022 |
Contacts
Department of National DefenceMatt Reid, Master Electrician, Electrical Design/ SNR Project Manager
Detachment Cold Lake, Real Property Operations Unit (West)
Cold Lake, Alberta T9M 2C6
Telephone: 780-840-8000 ext. 8422
Email: Matthew.reid3@forces.gc.ca
-
Location
- 4 Wing Cold Lake (Alberta)
-
Nature of Activity
- Highways and Roads
- Maintenance activities (fences, walls)
-
Assessment Status
Completed -
Start Date
2022-09-21 -
Proponent
Department of National Defence -
Authorities
- Department of National Defence
-
Assessment Type
Project on federal lands -
Reference Number
83986
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Powwow Arbour Construction
Pierceland -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Ministikwan Subdivision Development
Ministikwan IR 161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
OS -7254 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad - Public Comments Invited
Kehewin Cree Nation -
Kehewin Cree Nation Telus Tower AB103726
Kehewin Cree Nation -
Telus telecommunications tower located on Kehewin Cree Nation located south of Bonnyville, AB
Telus telecommunications tower located on Kehewin Cree Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Regional Assessment of Beaver Lake Cree Nation's Traditional Territory
Lac la Biche -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake CFS Equine Centre
Frog Lake -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
New Fibre Installation
Saddle Lake 125 -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Flying Dust Commercial Project
Meadow Lake -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Buffalo River Dene Nation Fire Hall
Peter Pond Lake Indian Reserve No. 193 -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Dore Lake Wharf Removal
Dore Lake -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L