1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
1 Combat Engineer Regiment, located at 3rd Canadian Division Support Base Edmonton, proposes to create an additional parking lot to allow for the storage of engineer equipment and vehicles. The gravel parking area will be directly connected to the current compound, and allow for additional space requirements.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
August 11, 2022 – The public comment period on the project is closed. The Department of National Defence is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Contacts
Department of National DefenceAustin Gallais, Operations Officer, 15 Support Squadron, 1 Combat Engineer Regiment
15 Support Squadron, 1 Combat Engineer Regiment
Post Office Box 10500 Station Forces
Edmonton, Alberta T5J 4J5
Telephone: 780-973-4011 ext. 3504
Email: Austin.gallais@forces.gc.ca
-
Location
- 3rd Canadian Division Support Base Edmonton (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2022-07-22 -
Proponent
Department of National Defence -
Authorities
- Department of National Defence
-
Assessment Type
Project on federal lands -
Reference Number
83845
Nearby assessments
...within 200 kilometres-
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Trans Mountain Expansion Project
Edmonton -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Base Line Terminal Project
Edmonton -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Alexander Wastewater Treatment Plant
Alexander First Nation -
Alexander First Nation: BF 77352 Replacement and Twp. Rd 562 Improvements
Alexander First Nation -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Alexander First Nation Campground Project
Alexander First Nation -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Astotin Lake Dock Replacement
Elk Island National Park -
Lamont Railcar Storage Project
Northwest of Lamont -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Xplornet Telecommunications Tower Project
Alberta Beach -
Paul First Nation Gas Station Project
Paul First Nation -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Waheeba Solar Energy Project
Alexis First Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Sundance 7 Generating Station Project
Wabamun -
Genesee Generating Station Expansion Project
Near Warburg -
Ryley Biomedical Waste Incinerator Project
Ryley -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Ryley Facility Expansion Project
Ryley -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Moraine Power Generation Project
Whitecourt -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Sunchild Gas Distribution Line
Sunchild -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Kehewin Lift Station Project
Kehewin Cree Nation -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Drayton Valley -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
TransCanada Energy East Pipeline Project
Hardisty -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Enbridge Line 3 Replacement Program
Hardisty -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Sawridge Band Solar Farm Project
Sawridge Band -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Clearwater Peat Harvesting Project
Caroline -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood)