Pre-Fabricated Office Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Two locations in Rouge National Urban Park will be repurposed to serve as office headquarters for park staff. Each location, will have less 1 acre repurposed to include staff parking, driveway and footing to receive the pre-fabricated office. The first location, 363 Old Finch, is in the Toronto region of Rouge National Urban Park, repurposing the foundation of a vacant house. The second location, 9182 York Durham Line, is in the Markham region of Rouge National Urban Park, adjacent to the Warden Office and repurposing a fallow farm field. The works to prepare the site will begin in February 2021 with completion of receiving the offices by the end of the calendar year.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | October 19, 2021 |
1 | New project being assessed by Parks Canada - Public comments invited from January 15 to February 14, 2021 | - | January 15, 2021 |
Contacts
Rouge National Urban Park3545 Kingston Road, Floor #2
Scarborough, Ontario M1M 1R6
Telephone: 416-264-2020
Fax: 416-264-2167
Email: rouge@pc.gc.ca
-
Location
- Rouge National Urban Park (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2021-01-15 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81288
Nearby assessments
...within 200 kilometres-
Rouge Gateway Visitor Learning and Community Centre
Rouge National Urban Park -
Trans Northern Pipeline Integrity Digs
Rouge National Urban Park -
Conlins Road Stormwater Management Facility Outfall Restoration
Rouge National Urban Park -
Stream Restoration of Morningside Creek Downstream of Casebridge Outfall
Rouge National Urban Park -
Trailheads and Connections
Rouge National Urban Park -
Barn Foundation Rehabilitation
Rouge National Urban Park -
Glen Rouge Campground Revitalization
Rouge National Urban Park -
Rouge National Urban Park Study
Rouge National Urban Park and adjacent lands -
Septic System Replacement - 2023
Rouge National Urban Park -
Beach and Boardwalk to 401
Detailed Impact Assessment, Rouge National Urban Park -
New Fibre Installation (YTN Telecom Network Inc.)
Rouge National Urban Park -
Municipal Water Infrastructure, City of Pickering Zone 4 and 5
City of Pickering -
PIN 614406 (230 Concession 7), Pickering - Glen Cedars Golf Club - renewed Commercial Lease for a golf course
Pickering -
Wheelhouse Marine Supply, Brougham, Ontario
Brougham, Ontario -
Deer Exclusion Fencing
Rouge National Urban Park -
TCG National Storage Facility, Spring St., Pickering Ontario
Pickering -
Boyles Cemetery to Bob Hunter Trail Construction
Rouge National Urban Park -
Tile Drainage System
Rouge National Urban Park -
Septic System Replacements
Rouge National Urban Park -
Wetland Restoration Program 2023-2024
Rouge National Urban Park -
Agricultural Drainage System Expansion, Pickering Township Concession 7, Lot 19-22
City of Pickering -
BLUFFER'S PARK SOUTHWEST HEADLAND AND BEACH MAJOR MAINTENANCE
Bluffer's Park, Toronto, Ontario -
Site Office Exterior Columns Review and Repair
5070 Sideline 22, Pickering, Ontario, L1Y 1A3 -
Ontario Line Project
Ontario Science Centre -
Eastern Mainline Project
Markham -
Ontario Line
Toronto -
2022 Aquatic Restoration Program: Stream Rehabilitation and Removal of Instream Barriers in the West Duffins Creek Watershed in Rouge National Urban Park
Rouge National Urban Park -
Potential Regional Assessment of the Toronto-Danforth Area
Toronto-Danforth -
Whitby Harbour Maintenance Dredging 2022
Whitby Harbour -
Whitby West Pier Repairs 2021
Whitby Small Craft Harbour -
Asphalt Removal and Replacement, 4905 Dufferin Street, Toronto, Ontario
4905 Dufferin Street, Toronto, Ontario -
Exterior Metal Refurbishing
4905 Dufferin Street, Toronto -
Refinish Metal Cladding Roof and Exterior Transformer Vault
4905 Dufferin Street, Toronto, Ontario -
Chiller and Cooling Tower Replacement
4905 Dufferin Street, Toronto, Ontario -
Re-leveling of Interlock Stone Pavers
4905 Dufferin Street, Toronto, Ontario -
Port of Oshawa West Wharf Fencing project - 1621 Simcoe Street South, Oshawa, Ontario
Port of Oshawa - 1621 Simcoe Street South, Oshawa, Ontario -
Removal of two underground concrete tanks
Oshawa -
Ontario Line
Toronto -
Port of Oshawa - Relocation of Floating Dock
Oshawa, Ontario -
Port of Oshawa - Warehouse Upgrade
1050 Farewell Street, Oshawa, Ontario -
Port of Oshawa Shore Power and Security Upgrades
Oshawa -
Port of Oshawa - East Wharf Storm Water Management and Surfacing
Oshawa -
Ontario Line Project
Exhibition/Ontario Place -
Port of Oshawa Salt Terminal
Oshawa -
Port of Oshawa - Extension of Berm Adjacent to Second Marsh
Oshawa -
GTA West Project
Highway 400 -
Eastern Mainline Project
Bowmanville -
Keswick Post Office Site Remediation
Keswick -
Lake Scugog Enhancement Project
Trent-Severn Waterway National Historic Site of Canada -
Habitat Improvements on Lake Scugog - Components of the Fisheries Offset Plan for the Lake Scugog Enhancement Project (LSEP)
Trent-Severn Waterway National Historic Site of Canada -
Refurbishment and Continued Operation of the Darlington Nuclear Generating Station
Darlington -
Hertz Fuel Dispensing System
Toronto Pearson International Airport (GTAA) -
Rehabilitate Employee Parking Lots
Toronto Pearson International Airport (GTAA) -
Installation of Potassium Acetate Tanks
Toronto Pearson International Airport (GTAA) -
In Situ Vertical Thermal Response Test
Toronto Pearson International Airport (GTAA) -
Proposed Hotel and Event Facility Centre Development
Toronto Pearson International Airport (GTAA) -
Non-Passenger Screening for Vehicles - North
Toronto Pearson International Airport (GTAA) -
Nav Canada Toronto Transmitter Back-up Towers Replacement
Toronto Pearson International Airport (GTAA) -
Shell Business Aviation Tank Farm
Shell Business Aviation Tank Farm -
Spring Creek Sediment Clean Out
Toronto Pearson International Airport (GTAA) -
Region of Peel East to West Wastewater Diversion Project
Toronto Pearson International Airport -
FedEx Facility Parking Lot Expansion
FedEx -
Bradford Bypass Project
East Limits at Highway 404 -
CAE Flight Simulator Expansion
CAE Flight Simulator -
Retaining Wall Dixie Road and Courtney Park Drive
Toronto Pearson International Airport (GTAA) -
Nav Canada Pearson Localizer 23 Remote Unit
Toronto Pearson International Airport (GTAA) -
Outfall Pipe, Lake Scugog, Scugog Township
Scugog Township -
Bradford Bypass Project
West Limits at Highway 400 -
Construction and Operation of Building A-320, at CFB Borden
21c Spitfire Lane, Canadian Forces Base Borden -
Baldwin East Aerodrome Project
Town of Georgina -
Pefferlaw Small Craft Harbour Tree & Brush Removal
Pefferlaw -
GTA West Project
Highway 401/407 -
Georgina Island Fixed Link Project
Lake Simcoe between Georgina Island to Town of Georgina in Ontario -
Chippewas of Georgina Island - Rehabilitation of Watermains
Georgina Island -
Chippewas of Georgina Island First Nation - Early Childhood Learning Centre
Georgina Island -
Chippewas of Georgina Island First Nation - South/East Region Watermain Extension
Georgina Island First Nation -
Parking Lot Expansion and Re-pavement at Postal Service (PS) Georgetown, ON
112 Guelph St, Georgetown, ON, L7G 3Z0 -
Junior Commissariat Officers' Quarters - Recapitalization Project
Niagara National Historic Sites -
Canadian Coast Guard Port Weller Search and Rescue Station Dock Replacement
St. Catharines -
Port Weller Water Level Gauge Station Shoreline Reinforcement Project
St. Catharines -
The Proposal by Cameco Corporation for the Redevelopment of its Port Hope Conversion Facility (Vision 2010)
Port Hope -
Beaverton Small Craft Harbour Platform Removal
Beaverton, ON -
Parking Lot Asphalt Replacement at Toronto West (Milton) Detachment
Milton -
Dalhousie Yacht Club - Travel Lift
Dalhousie Yacht Club, Port Dalhousie, ON -
Erin Wastewater Treatment Plant Project
Town of Erin -
Milton Logistics Hub Project
Milton -
Dredging Projects for Six (6) Properties Bordering the Trent-Severn Waterway: (1), Balsam Lake, (2) Buckhorn Lake, (3) Stoney Lake, (4) Pigeon Lake, (5) Balsam Lake, and (6) Sparrow Lake
(6) 3500 Lauderdale Point Cres, Severn, Sparrow Lake, O -
Ontario Waterways- TSW- Pretty Channel Road Upgrade
Trent-Severn Waterway National Historic Site of Canada -
Replace Selected Exterior Hardscape, Retaining Wall and Fence
48 Owen Street, Barrie, Ontario -
Installation of Beaver Baffles in Range and Training Area B2, at Canadian Forces Base Borden
Canadian Forces Base Borden -
Grey and Simcoe Foresters Storage Compound Building, Borden - Ontario
Canadian Forces Base Borden -
High Speed Driver Training Track Improvements - Canadian Forces Base (CFB) Borden
Canadian Forces Base (CFB) Borden -
Trent-Severn Waterway Durham Regional Road 50 Bridge
Trent-Severn Waterway National Historic Site -
Pad A Demolition at Building T-126 at CFB Borden
Canadian Forces Base Borden -
Construction and Operation of a Transition Centre at CFB Borden, Ontario
Canadian Forces Base Borden -
Full Depth Parking Lot Reconstruction / Repaving at Building P-148
Canadian Forces Base Borden -
Dredging Projects for Six (6) Properties Bordering the Trent-Severn Waterway: (1), Balsam Lake, (2) Buckhorn Lake, (3) Stoney Lake, (4) Pigeon Lake, (5) Balsam Lake, and (6) Sparrow Lake
(1) Osprey Trail, Balsam Lake, ON -
Soil Remediation at CFB Borden Firefighter Training Area
CFB Borden Firefighter Training Area which is approximately 3.6 km southeast of Lisle, Ontario -
Construction of 400 Squadron Transition Infrastructure (H-18), CFB Borden
Canadian Forces Base Borden -
Standing Offer for General Construction at CFB Borden, Ontario
Canadian Forces Base Borden -
Burlington Canal Pier safety improvements
Burlington Canal Piers -
New RV Compound at CFB Borden
Canadian Forces Base Borden -
Burlington Lift Bridge - Storage Tank Upgrades
Burlington Lift Bridge 1157 Beach Boulevard Hamilton, Ontario -
Burlington Lift Bridge - Security Gate & Fence Installation, Parking Lot Asphalt Paving and New Meeting Room
Burlington Lift Bridge 1157 Beach Boulevard Hamilton, Ontario -
Burlington Light Tower Relocation
Hamilton, Ontario -
Snug Harbour Marina Upgrade, Sturgeon Lake, Ontario
Trent-Severn Waterway National Historic Site -
Construction and Operation of a new Gas Hut - Canadian Forces Base Borden
Canadian Forces Base Borden -
Construction of a Winter Maintenance Yard, Canadian Forces Base (CFB) Borden
CFB Borden (the Site). The Site is located approximately 3 km southwest of Angus, ON. -
Reid Road Reservoir Quarry Project
Milton -
Safety Repairs on Canal Trail
City of Thorold -
Burlington Lift Bridge Deck Replacement
1157 Beach Blvd, Hamilton, ON L8H 6Z9 -
Boat Slip Sediment Remediation Project
Hamilton Harbour -
Beaver Narrows Resort, 433 Beaver Rd, Pigeon Lake, Omemee - Dredge
Trent-Severn Waterway National Historic Site -
Randle Reef Contaminated Sediment Remediation Project
Hamilton Harbour -
Dredging Projects for Six (6) Properties Bordering the Trent-Severn Waterway: (1), Balsam Lake, (2) Buckhorn Lake, (3) Stoney Lake, (4) Pigeon Lake, (5) Balsam Lake, and (6) Sparrow Lake
(5) 344 Indian Point Road, CKL, Balsam Lake, ON -
Beaver Creek Institution - New/Existing Pump Station Upgrade
Beaver Creek -
Fire Pump and Generator Replacement at John Weir Foote Armoury
John Weir Foote Armoury, 200 James Street North in Hamilton -
Ontario Waterways-Trent-Severn Waterway Kirkfield Shops Expansion
Trent-Severn Waterway National Historic Site -
Town of Shelburne Long-Term Well Project
Shelburne -
Hiawatha First Nation Water Treatment System Upgrades
Project Area -
Paudash Street Reconstruction
Hiawatha -
Private Residence - Dredging and Shoreline Works Projects for four (4) Properties Bordering the Trent-Severn Waterway
Trent-Severn Waterway National Historic Site of Canada -
Hiawatha First Nation Water Systems Upgrade
Hiawatha First Nation -
Safety Repairs on Canal Trail
City of Thorold -
Port Severn Dam 'G' Little Chute Rehabilitation
Trent-Severn Waterway National Historic Site of Canada -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 190274
Trent-Severn Waterway National Historic Site -
Dredging Projects for Six (6) Properties Bordering the Trent-Severn Waterway: (1), Balsam Lake, (2) Buckhorn Lake, (3) Stoney Lake, (4) Pigeon Lake, (5) Balsam Lake, and (6) Sparrow Lake
(4) 36 Fire Route 121, Trent Lakes, Pigeon Lake, ON -
Shilling Subdivision Chippewas of Rama First Nation
Chippewas of Rama First Nation -
Trent Rapids Power Corporation (TRPC), Peterborough Utilities Inc (PUI) Hydro Intake Excavation
Trent-Severn Waterway National Historic Site -
Bobcaygeon Beach Park Redevelopment, Trent Severn Waterway, Bobcaygeon
Bobcaygeon -
Dredging Projects for Six (6) Properties Bordering the Trent-Severn Waterway: (1), Balsam Lake, (2) Buckhorn Lake, (3) Stoney Lake, (4) Pigeon Lake, (5) Balsam Lake, and (6) Sparrow Lake
(2) 1674 Greenwood Lane West, Selwyn, Buckhorn Lake, ON -
840 Fife's Bay, Marina Lane, Chemong Lake (Private Landowner) - Shoreline Stabilization, Boat Launch, Dredge
Trent-Severn Waterway National Historic Site of Canada -
TSW Water Soldier Herbicide Control 2020
Trent-Severn Waterway National Historic Site -
2607 & 2609 Fire Route 14B, Chemong Lake, Selwyn - Dredge
Trent-Severn Waterway National Historic Site -
1965 Pinehurst Ave., Selwyn, Upper Chemong Lake - Wet Slip Infill
Trent-Severn Waterway National Historic Site -
Alderville First Nation - Communal and POE Water Treatment Systems
Alderville First Nation Reserve -
Curve Lake First Nation - Water Treatment System
Curve Lake First Nation -
Eastern Mainline Project
Cobourg -
Curve Lake Catch Basin and Roads Stormwater Improvements
Curve Lake Roads Stormwater Improvements -
Construction of the Former Welland Canal Crossing
Dain City -
Dredging Projects for Six (6) Properties Bordering the Trent-Severn Waterway: (1), Balsam Lake, (2) Buckhorn Lake, (3) Stoney Lake, (4) Pigeon Lake, (5) Balsam Lake, and (6) Sparrow Lake
(3) 1378 Birchview Road, Douro-Dummer, Stoney Lake, ON -
Dain City Multi-use Trail Improvements
Port Colborne, Ontario -
Couchiching Lock 42 and Bridge 56 Rehabilitation
Trent-Severn Waterway National Historic Site -
Waterloo Airport Runway Project
Region of Waterloo International Airport, Runway 14-32 -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200127
Trent-Severn Waterway National Historic Site -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200013
Trent-Severn Waterway National Historic Site -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 210241, Sparrow Lake, ON
Trent-Severn Waterway National Historic Site -
Docks, Hasting Village Marina North and South Side
Hastings Village Marina -
Installation of Hastings Second Watermain Crossing of Trent River
Trent Hills -
Burleigh Falls Dam Replacement, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Lighting and Pathway Upgrades
Woodside National Historic Site -
Six Nations of the Grand River Wastewater Lagoons Forcemain Upgrade Construction
Six Nations reserve No. 40 -
Dockside Dredge Trent-Severn In-Water and Shoreline Works Permit 190113
Trent-Severn Waterway National Historic Site -
Six Nations of the Grand River Territory - Bridge #7 Replacement
Six Nations of the Grand River -
Private Residence - Dredging and Shoreline Works Projects for three (3) Properties Bordering the Trent Severn Waterway
Trent-Severn Waterway National Historic Site of Canada -
Mississaugas of the Credit First Nation - Oversized Solid Waste and Recycling Depot
Mississaugas of the Credit First Nation -
Mississaugas of the Credit First Nation - Lloyd S. King Elementary School Expansion Project
Mississaugas of the Credit First Nation -
Warkworth Institution - Wastewater Treatment System- Pipe Cleaning and Replacement
Warkworth Institution -
Re-Establishing Our Healing Journeys
Mississaugas of the Credit First Nation Reserve -
Campbellford Bridge/Trent River Crossing
Detailed Impact Assessment, Trent-Severn Waterway National Historic Site -
White's Falls Dam Replacement, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Nappan Island Bridge Replacement, Municipality of Trent Hills
Municipality of Trent Hills -
Beaver Creek Institution - Parking expansion
Beaver Creek Institution -
Tobey Dock Reconstruction
Georgian Bay Islands National Park -
Honey Harbour Parking Lot
Georgian Bay Islands National Park of Canada -
Impeed the Reed
Georgian Bay Islands National Park -
Thornbury Harbour Fuel System Removal and Replacement - 2021
Thornbury Harbour -
Thornbury West Pier Deck Repairs - 2021
Thornbury -
YMCA Camp Queen Elizabeth Cabin Improvement Project
Georgian Bay Islands National Park -
Trenton Lock 1, Trent River - Dredge
Trent-Severn Waterway National Historic Site -
Trans Northern Pipelines Inc. (TNPI) Trent River Crossing Repair
Trent-Severn Waterway National Historic Site -
Vegetation Removal - 8 Wing Trenton
8 Wing Trenton -
Remediate Boxcar Road Culvert at 8 Wing Trenton
Boxcar Road, 8 Wing Trenton Ontario -
Soil Remediation at Jannacks Narrows Minor Shore Light, Bala Park Island, Ontario
Jannacks Narrows Minor Shore Light, Ontario -
Culvert Replacement- Taxiway Golf, 8 Wing Trenton
8 Wing Trenton -
Reconfigure South Side Entrance at 8 Wing Trenton, Trenton Ontario
Anson Ave, 8 Wing Trenton from Old Highway 2, Quinte West to Yukon St, 8 Wing Trenton -
Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation
Beausoleil First Nation Reserve -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Design and Construct CJIRU - Geotechnical and Topographical Study at the 8 Wing Trenton Airfield
8 Wing/Canadian Forces Base Trenton -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Wahta Mohawks - Waste Transfer Station and Landfill Closure
Wahta Mohawks -
Wahta Mohawk Housing Subdivision Project
Wahta Mohawk -
Marmora Clean Energy Hub Project
Municipality of Marmora and Lake, in Hastings County -
Meaford Harbour Fuel Tank System Installation - 2021
Meaford -
Port Dover Search and Rescue Station Floating Dock Repairs
Port Dover -
Urgent Fuel Storage Tank Code Compliance
494 Dundas St E, Belleville, ON -
Tree Removal, Phase 2 - Canadian Forces Detachment Mountain View
Canadian Forces Detachment Mountain View -
Trent-Severn Waterway, Esson Lake Earth Dam Rehabilitation
Trent-Severn Waterway National Historic Site of Canada -
Paardeberg Range Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
4th Canadian Divsion Training Centre (Meaford) North Shore Road Erosion Control
4th Canadian Division Training Centre (Meaford) -
Fisheries Habitat Construction at Big Island Marsh
Trent-Severn Waterway National Historic Site -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 5A/C -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 12 -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 10 -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 1 -
Kenhtè:ke Language and Cultural Centre (KLCC)
Shannonville -
Eastern Mainline Project
Belleville -
10th Street Bridge Reconstruction, Owen Sound
Owen Sound -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge
Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge -
Break Wall Repairs by private home owner - 318433 Grey Rd 1, Owen Sound Harbour, ON
Owen Sound Harbour -
Mohawks of the Bay of Quinte First Nation - Watermain Extension Phase III
Mohawks of the Bay of Quinte First Nation, Ontario -
MBQ - Phase IV Watermain Extension
Mohawks of the Bay of Quinte First Nation -
Quinte Mohawk School - Asphalt Play Area rehabilitation
Mohawks of the Bay of Quinte First Nation -
Replacement of Big Creek Bridge on Long Point Causeway
Replacement of Big Creek Bridge on Long Point Causeway -
Water Control Infrastructure and Dike Repair and Maintenance - Big Creek National Wildlife Area
Big Creek National Wildlife Area -
Mohawks of the Bay of Quinte - Elder Care Home
Tyendinaga Mohawk Territory -
Mohawks of the Bay of Quinte - Elder and Disabled Care Home Construction
Mohawks of the Bay of Quinte First Nation -
Watermain Extension on Old Highway 2, Bells Road and North Street
Tyendinaga Mohawk Territory -
Mohawks of the Bay of Quinte - Lot Servicing for future houses
Mohawks of the Bay of Quinte -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Port Burwell Marina Floating Docks
Port Burwell, ON -
Wiarton Breakwater Replacement
Wiarton Launch Ramp -
Port Burwell Maintenance Dredging
Lake Erie, Port Burwell, Ontario -
New Fibre Installation
Saugeen Indian Reserve No. 29 -
Dock Removal - Georgian Bay Islands National Park
Georgian Bay Islands National Park -
Port Elgin Maintenance Dredging 2021
Port Elgin -
Napanee Generating Station Project
13 kilometres south of Napanee -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Courtyard Pavement Refurbishment and Sealing of the Underground Roof GarageCourtyard Pavement Refurbishment and Sealing of the Underground Roof Garage
451 Talbot Street, London, Ontario -
Septic Tank Replacement at Newburgh Post Office
31 Homer Street -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
Bath Institution - Sewer Outfall for Loyalist Township
Bath Institution -
Bath Institution - New 96 Bed Living Unit
Bath -
Resurfacing and Paving Exterior Roadways at Bath/Millhaven Institutions
Bath/Millhaven Institutions -
Deep Geologic Repository for Low and Intermediate Level Radioactive Waste
Bruce Nuclear Site -
Douglas Point Waste Facility Infrastructure Decommissioning Project
Douglas Point Waste Facility (DPWF)