Pier 61 decommissioning

Trans Mountain Pipeline ULC (the Applicant) is proposing the removal of Pier 61, which is the old pier at the Westridge terminal. The Transmountain Expansion Project (PER 19-162) created three new berths at an entirely new pier to the west of Pier 61. The project will include the decommissioning and removal of existing foreshore process piping and equipment, electrical equipment, small structures on land and on the pier, vessel loading equipment, and the dock structure including cofferdams, walkways, trestles and piles. Removed equipment and material will be disposed of in accordance with relevant regulations.


Latest update

Notice of Determination

Vancouver B.C. – April 16, 2026 – The Vancouver Fraser Port Authority has determined that the proposed Pier 61 decommissioning - located in Burrard Inlet, east of the Second Narrows Bridge is not likely to cause significant adverse environmental effects.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Pier 61 decommissioning (British Columbia)
  • Nature of Activity

    • Ports and Harbours
    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2026-02-02
  • Proponent

    Westridge Marine Terminal
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    90199