Elsipogtog New Subdivision

Construction of a new, 20 lot subdivision in Elsipogtog First Nation, NB. Each lot will be approximately 1800m2 (30m x 60m). Construction activities include: a new municipal-type service roadway with water supply and sewer connection to residential lots. The work will consist of installation of environmental protection measures (e.g. silt fencing for erosion and sedimentation control); site grading and construction of ditch and drainage swales to control runoff; construction of the municipal roadway to services the subdivision; installation of water and sewer services (e.g. distribution/collection piping, service laterals); and installation of culverts for individual lot driveways.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

June 23, 2021 – Indigenous Services Canada issued its notice of determination  https://iaac-aeic.gc.ca/050/evaluations/document/139470  and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination for the Elsipogtog New Subdivision - June 23, 2021
1 Public Comment Period on Intent to Make a Determination - May 3, 2021

Contacts

Indigenous Services Canada - Atlantic
Indigenous Services Canada
PO BOX 160
40 Havelock Street
Amherst, Nova Scotia B4H 3Z3
Telephone: 1-800-567-9604
Fax: 902-661-6237
Email: aadnc.paeat-erpat.aandc@canada.ca


  • Location

    • Elsipogtog First Nation (New Brunswick)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Completed
  • Start Date

    2021-05-03
  • Proponent

    Elsipogtog First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    81592

Nearby assessments

...within 200 kilometres
Date modified: