Replace three culverts located at Farnham Garrison, Quebec

The objective of the project is to ensure the safety of users of the roads in Farnham Garrison on which the targeted culverts are located. Currently, the culverts identified in figure 1.3 Location of the Proposed Project have reached their useful life. In particular, the road overhanging culvert # 1 has subsided. Thus, the project consists of replacing the culverts according to the standards in force while putting forward the imposed environmental mitigation measures. Work phases: Related surveys, hydraulic studies, design, construction, site restoration.

 


Latest update

September 10, 2020 – The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Projects manager, Real Property Operations Detachment (St-Jean)
Department of National Defence
Francis Fortier, Projects manager, Real Property Operations Detachment (St-Jean)
Real Property Operations Detachment (St-Jean)
BS 2 Div CA Det St-Jean
PO Box 100 Station Forces
Richelain, Quebec J0J 1R0
Email: francis.fortier@forces.gc.ca


  • Location

    • Garnison Farnham, 1111 Rue Principale ouest, Farnham (Quebec)
  • Nature of Activity

    • Water Management
  • Assessment Status

    Completed
  • Start Date

    2020-06-02
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    80754