Construction of a fertilizer plant in Bécancour Project

IFFCO Canada Enterprise Limited proposes the construction and operation of a fertilizer production plant, in the form of urea, with a production capacity of 3850 metric tons per day. The industrial complex would be located in the industrial park and port facility of Bécancour, in Quebec. In the event of the closure of the fertilizer production plant, the industrial facilities would be dismantled, and the site would be characterized and decontaminated as needed.

This is a revised project description. The Agency decided to initiate a new screening after being informed of a change to the project (construction of the plant would be on Lot 6 and not Lots 3 and 4 in the industrial park and port facility of Bécancour).


Latest update

March 18, 2013 - The Canadian Environmental Assessment Agency issued its environmental assessment determination and decided that an environmental assessment of the designated project is not required.

Participate

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca


  • Location

    • Bécancour (Quebec)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Completed
  • Proponent

    IFFCO Canada Entreprise Limited
  • Authorities

    • Canadian Environmental Assessment Agency
  • Assessment Type

    Assessment not applicable
  • Reference Number

    80033