YUL Montreal-Trudeau International Airport - Work for the construction of taxiways connected to Runway 24R-06L (North runway)

The project consists of work for the construction of taxiways connected to Runway 24R-06L. The work will be done in two phases. The first phase of the project, scheduled for 2022, consists of excavation, drainage and granular foundation work in preparation for the construction of rapid exits. The second phase (2023-2024) will be completing the construction of the connected taxiways and the addition of a taxiway. 


Latest update

March 11, 2022 - ADM Aéroports de Montréal and Transport Canada issued the Notice of Determination and have determined that the project is not likely to cause significant adverse environmental impacts.

Participate

Contacts

Public Affairs
ADM Aéroports de Montréal
800 Place Leigh-Capreol
Office 1000
Dorval, Quebec H4Y 0A5
Email: consultation-projets@admtl.com


  • Location

    • YUL Montréal-Trudeau International Airport (Quebec)
  • Nature of Activity

    • Airport and Airfields
  • Assessment Status

    Completed
  • Start Date

    2022-01-31
  • Proponent

    ADM Aéroports de Montréal
  • Authorities

    • Montreal Airport Authority
    • Transport Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83328
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: