CPC West Parking Lots & Roadway Replacement - Phase 5 and 6

The project scope involves design services, construction drawings and construction administration services related to Parking Lots, Walkways and Roadway replacement at the RCMP Campus - 1 Sandridge Rd. Ottawa, Ontario. Complete removal of existing asphalt pavement roadway and walkway, and removal of concrete curbs. Full reinstatement of the asphalt pavement roadway and walkway surfaces, new Granular A and Granular B to required levels, new catch basins and the reinstatement of all concrete curbs, as required.           


Latest update

The public comment period on the project is closed. The Royal Canadian Mounted Police is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Contacts

Royal Canadian Mounted Police
Iain Melvin, Manager, National Environmental Policy Central
Dartmouth, Nova Scotia B2V 1P9
Telephone: 902-221-2429
Email: iain.melvin@rcmp-grc.gc.ca


  • Location

    • Ottawa (Ontario)
  • Nature of Activity

    • Highways and Roads
  • Assessment Status

    In progress
  • Start Date

    2022-03-21
  • Proponent

    Royal Canadian Mounted Police
  • Authorities

    • Royal Canadian Mounted Police
  • Assessment Type

    Project on federal lands
  • Reference Number

    83252
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: